Hennepin County

Welcome, Guest!
Log in | Employee Login | License
 

Messages

PROJECT QUESTION: For the ?Drainage System? pay item it talks about a prefabricated pump station but I do not see a manufacturer called out or any details regarding it? Is there a specific manufacturer that will be required?

Q: For the 'Drainage System' pay item it talks about a prefabricated pump station but I do not see a manufacturer called out or any details regarding it? Is there a specific manufacturer that will be required?

A: In the last paragraph of SWR-1.2 Scope of Work we indicate shop drawings will required. We do not have any particular manufacturer required. 'Shop drawings of the entire pumping system from intake screen to butterfly valve manholes (and all components in between) shall be submitted to the Engineer for review and approval. Butterfly valve manholes shall be 60 inches.'