On sheet SS-2, does the vertical pole 7 remain inplace? Just F&I a new mast arm for this pole? This pole also calls for (2) new 2” Conduits for lighting into the existing signal pole foundation. Is this correct? Is the conduit from HH 4 to HH 1 existing or to be new?

Q: On sheet SS-2, does the vertical pole 7 remain inplace? Just F&I a new mast arm for this pole? This pole also calls for (2) new 2” Conduits for lighting into the existing signal pole foundation. Is this correct? Is the conduit from HH 4 to HH 1 existing or to be new?

A: Yes, vertical pole 7 remains in place. Yes, just F&I a new mast arm for this pole. Correct.There might be one 2” NMC stubbed out already, but as-builts are not clear. Please assume F&I 2 NMC for lighting. The conduit from HH 4 to HH1 is new.