PROJECT QUESTIONS; Just curious being that it?s allowed to process and haul the bridge demo on site, the cost to saw cut the bridge into pieces, and bring in much larger cranes to raise and lower the pieces is incredibly more expensive for a bridge that small so I guess my question is-Will the owner accept other methods of removing the existing bridge?

Question: Just curious being that it is allowed to process and haul the bridge demo on site, the cost to saw cut the bridge into pieces, and bring in much larger cranes to raise and lower the pieces is incredibly more expensive for a bridge that small so I guess my question is-Will the owner accept other methods of removing the existing bridge?

Response: Alternatives to removing the existing bridge can be reviewed by the Hennepin County Construction Project Engineer. Please also refer to Division S-26, 1707 Public Convenience and Safety, for requirements related to the roadway and trail surfaces during MPRB events and refer to Attachment B - MPRB Events 2017 Godfrey Parkway.