ADVERTISEMENT FOR BIDS

COLD IN PLACE RECYCLE
C.P. 183302; eGram Project ID 2183302
BIDS CLOSE March 26th, 2019
HENNEPIN COUNTY, MINNESOTA

 

 


Electronic bids for the above referenced project will be accepted through Hennepin County’s online electronic bid system (eGram) until 2:00 p.m., Tuesday, March 26th, 2019, at which time they will be publicly opened at the Hennepin County Purchasing and Contract Services office, A­‑1730 Government Center, Minneapolis, Minnesota 55487-0175.

Location: CSAH 10 & 50 in the City of Corcoran.

The major items of work are approximately: 1 LUMP SUM MOBILIZATION; 3 EACH REMOVE MAIL BOX SUPPORT; 12527 SQ FT REMOVE BITUMINOUS PAVEMENT; 1190 LIN FT SAWING BIT PAVEMENT (FULL DEPTH); 1465 LIN FT REMOVE PIPE CULVERTS; 10 LIN FT SALVAGE WOODEN FENCE; 989 TON AGGREGATE SURFACING CLASS 2; 15 HOUR STREET SWEEPER (WITH PICKUP BROOM); 474 TON AGGREGATE BASE CLASS 5; 280 TON BITUMINOUS MATERIAL FOR MIXTURE; 100 TON CEMENT; 796 TON BITUMINOUS PATCHING MIXTURE; 100 TON BITUMINOUS PATCHING MIXTURE DRIVEWAY; 20 TON BITUMINOUS PATCH MIXTURE (SPECIAL); 63588 SQ YD MILL BITUMINOUS SURFACE (1.0"); 11200 GAL BITUMINOUS MATERIAL FOR FOG SEAL; 10778 TON TYPE SP 9.5 WEARING COURSE MIX (3;B); 70002 SQ YD COLD-IN-PLACE RECYCLED / CCPR BITUMINOUS; 6 EACH 15" CS PIPE APRON; 4 EACH 18" CS PIPE APRON; 2 EACH 42" RC PIPE APRON; 2 EACH 48" RC PIPE APRON; 2 EACH PIPE TIES; 16 EACH 18" PIPE APRON; 18 EACH 24" PIPE APRON; 2 EACH 36" PIPE APRON; 98 LIN FT 15" CS PIPE CULVERT; 52 LIN FT 18" CS PIPE CULVERT; 73 LIN FT 42" RC PIPE CULVERT; 47 LIN FT 48" RC PIPE CULVERT; 452 LIN FT 18" PIPE CULVERT; 535 LIN FT 24" PIPE CULVERT; 98 LIN FT 36" PIPE CULVERT; 123 LIN FT 24" RC PIPE SEWER DES 3006; 1 EACH CASTING ASSEMBLY; 2.7 LIN FT CONSTRUCT DRAINAGE STRUCTURE DESIGN H; 1 EACH CONNECT TO EXISTING CATCH BASIN; 175 SQ YD GEOTEXTILE FILTER TYPE 3; 42 CU YD RANDOM RIPRAP CLASS II; 1 EACH MAIL BOX; 2 EACH MAIL BOX SUPPORT; 10 LIN FT INSTALL WOODEN FENCE; 1 LUMP SUM TRAFFIC CONTROL AREA 1; 1 LUMP SUM TRAFFIC CONTROL AREA 2; 1 LUMP SUM TRAFFIC CONTROL SUPERVISOR 1; 1 LUMP SUM TRAFFIC CONTROL SUPERVISOR 2; 84 UNIT DAY PORTABLE CHANGEABLE MESSAGE SIGN; 168 SQ FT CONSTRUCTION SIGN-SPECIAL; 1 LUMP SUM WATER TREATMENT 1; 1 LUMP SUM WATER TREATMENT 2; 2 EACH STORM DRAIN INLET PROTECTION; 2013 LIN FT SILT FENCE, TYPE HI; 81 CU YD COMMON TOPSOIL BORROW; 27 EACH SITE RESTORATION; 12991 LIN FT 4" SOLID LINE PAINT; 47332 LIN FT 6" SOLID LINE PAINT; 3610 LIN FT 4" BROKEN LINE PAINT; 9541 LIN FT 4" DBLE SOLID LINE PAINT; 12991 LIN FT 4" SOLID LINE MULTI COMP GR IN; 46332 LIN FT 6" SOLID LINE MULTI COMP GR IN; 3610 LIN FT 4" BROKEN LINE MULTI COMP GR IN; 9541 LIN FT 4" DBLE SOLID LINE MULTI COMP GR IN; 60 SQ FT PAVT MSSG PAINT; 60 SQ FT PAVT MSSG PREF THERMO GR IN; 216 SQ FT CROSSWALK PREF THERMO GR IN , all in accordance with specifications and bid forms.

All project plans, specifications, instructions for bidders, the bid form and all other requirements are available at https://egram.co.hennepin.mn.us.

The advertisement for this project may also be viewed at the Minnesota Department of Transportation State Aid for Local Transportation eAdvert web site and at the Hennepin County web site at www.hennepin.us/contractopportunities under “Road and bridge construction”.
 

 

Zachary Rothstein

Hennepin County