05/21/2020 2:45 PMPROJECT QUESTION: It has been clarified that for bidding purposes, site access through Moon Valley Aggregate property is allowed. Will additional access be allowed through the Beatrice I. Zwierson Irrev. Trust property as well? Or will access through Moon Valley Aggregate then transition onto City of Chanhassen Property? Please advise as to where the Moon Valley Easement for access to the project will be located.Johnston, Judith L
05/20/2020 5:49 PMPROJECT QUESTION: What is the delineation between the concrete headwall to be removed and the original concrete culvert to remain? To what extend does the concrete headwall need to be removed in an effort to not damage the existing concrete culvert? Johnston, Judith L
05/20/2020 5:46 PMPROJECT QUESTION: Can you verify that we are to submit our bid both on bid vault and all original, signed documents emailed to bidVAULT@hennepin.us prior to 2pm on Tuesday, May 26, 2020.Johnston, Judith L
05/20/2020 5:44 PMPROJECT QUESTION: (2503) HDPE PIPE SEWER – DIRECTIONAL DRILLED Will the HDPE pipe be IPS or DIPS sized? The specifications only give the wall dimension as DR 17.Johnston, Judith L
05/18/2020 9:17 AMPROJECT QUESTION: Looking at this project, on line item 22 & 23 it calls out CAS Pipe Apron & Safety Grate. I do not see a MNDOT Plate for this – Do you have a preference ? Johnston, Judith L
05/14/2020 2:02 PMPROJECT QUESTION: Will the county release the Engineer’s Estimate for the project?Johnston, Judith L
05/14/2020 2:01 PMPROJECT QUESTION: What is the cable at the bottom of the landslide monitoring?Johnston, Judith L
05/14/2020 1:59 PMPROJECT QUESTION: Was an environmental soil investigation performed on the ‘Excavation Special’ material? Johnston, Judith L
05/14/2020 1:57 PMPROJECT QUESTION: : What type of anchors are required for the Turf Reinforcement Mat?Johnston, Judith L
05/14/2020 1:54 PMPROJECT QUESTION: Can the contractor trim vegetation along the trail for access?Johnston, Judith L
05/14/2020 1:51 PMPROJECT QUESTION: Does the DNR have jurisdiction over the north pipe outlet work?Johnston, Judith L
05/14/2020 1:49 PMPROJECT QUESTION: Is tree clearing around the north pipe outlet included in the plans?Johnston, Judith L
05/14/2020 1:45 PMPROJECT QUESTION: Can the contractor choose which access they use for construction? Johnston, Judith L
05/14/2020 1:43 PMPROJECT QUESTION: For bidding purposes, should it be assumed that access through Moon Valley will be available?Johnston, Judith L