Last ModifiedSubjectPosted By
07/19/2016 12:41 PMPROJECT QUESTION: Can the contaminated soil all be assumed to be usable as landfill daily cover?Johnston, Judith L
07/15/2016 3:40 PMLOCAL WORKFORCE INCENTIVE REMINDERTrboyevich, Jessica J
07/11/2016 1:48 PMPROJECT QUESTION: Are the stretches of suspected organic material regions listed in the specification the only areas required to be monitored for vibration and have precondition surveys completed for bidding purposes? Or is the entire project zone suspect to monitoring and survey?Johnston, Judith L
07/11/2016 1:45 PMPROJECT QUESTION: Items for Abandon Pipe Sewer and Abandon Watermain do not have any Description to that work. It does not say to sand fill. Do I assume we just bulk head the pipe as we abandon pipe sections?Johnston, Judith L
07/11/2016 1:41 PMPROJECT QUESTION: There are 6 each existing high rise apartment buildings with about 200 units each, with domestic and fire sprinklers that will be affected with temporary water supply. Is there any additional information related to temporary water alternatives during construction.Johnston, Judith L
07/11/2016 1:04 PMPROJECT QUESTION: What are the structure numbers, diameter of the structures, and the size of the largest inlet pipe for each of the 6 structures that require a baffle?Johnston, Judith L
07/11/2016 9:46 AMPROJECT QUESTION: Why the bid was extended for a week? Johnston, Judith L
07/07/2016 3:11 PMPROJECT QUESTION: Can the crushed bituminous temporary item 79 be a class 5 gravel product? The spec calls out 3/4 inch minus.Johnston, Judith L
07/06/2016 2:40 PMPROJECT QUESTION: When was this project approved for federal funding?Johnston, Judith L
07/06/2016 2:04 PMPROJECT QUESTION: What are the existing roadway materials on the County Road 53 (66th Street) project?Johnston, Judith L
07/06/2016 9:22 AMPROJECT QUESTION: I was wondering if you could explain the manhole design specials 3 through 15? Are they supposed to be booted connections? Integral base slabs? Johnston, Judith L
07/06/2016 9:11 AMPROJECT QUESTION: On sheet SS3 of SS79, note 2 for the ?TYPICAL SIGN SOCKET DETAIL? says there are supposed to be 2 sockets placed 12 inches apart.Johnston, Judith L
07/05/2016 3:41 PMPROJECT QUESTION: Who from the County will be running the job?Johnston, Judith L
07/05/2016 3:17 PMPROJECT QUESTION: Would it be possible to get the agenda and meeting minutes for the pre-letting conference?Johnston, Judith L
06/30/2016 1:46 PMPROJECT QUESTION: What is the contract number for Surety2000?Johnston, Judith L
06/30/2016 1:42 PMPROJECT QUESTION: What is the substantial completion date for the project?Johnston, Judith L
06/30/2016 7:05 AMPROJECT QUESTION: What DR rating is required for the C900 & C905 PVC for the storm sewer?Johnston, Judith L
06/29/2016 2:46 PMPROJECT QUESTION: I understand from the special provisions, that the PVC sanitary sewer pipe within the Vapor Mitigation Areas requires special polywrap and tape, while the HDPE storm sewer requires special gaskets. I am wondering if the PVC storm sewer in these areas requires anything special? Johnston, Judith L
06/29/2016 1:52 PMPRE-BID CONFERENCE MINUTESTrboyevich, Jessica J
06/29/2016 1:00 PMPROJECT QUESTION: I do not see the Lift station and Pump Inlet on the bid schedule. Are they not being replaced?Johnston, Judith L
06/29/2016 10:46 AMPROJECT QUESTION: Where can we obtain the geotech report for this job?Trboyevich, Jessica J
06/23/2016 3:34 PMPROJECT QUESTION: What is the engineers estimate for this project?Johnston, Judith L
06/23/2016 3:33 PMPROJECT QUESTION: Is there a specific DBE directory that is recommended to use for this project?Johnston, Judith L
06/17/2016 9:04 AMPROJECT QUESTIONSJohnston, Judith L