07/15/2014 8:22 AMPROJECT QUESTION: Concerning MCES CIPP ThicknessJohnston, Judith L
07/15/2014 8:08 AMPROJECT QUESTION: Concerning MCES Diversion SystemJohnston, Judith L
07/14/2014 2:50 PMPROJECT QUESTION: Is the item for salvage boulder intended to build Wall L?Johnston, Judith L
07/14/2014 2:49 PMPROJECT QUESTION: What size boulders will be required for the new boulder retaining wall? Johnston, Judith L
07/14/2014 2:43 PMPROJECT QUESTION: Who will remove the 850 railroad ties for this project? If there is a railroad contractor conducting this work, should the item be to dispose of railroad ties instead of remove?Johnston, Judith L
07/14/2014 2:42 PMPROJECT QUESTION: Our sheeting supplier has stated that the PZC-37 & PZC-39 cover plated sections are still in trial running and are not currently being made. Please provide an alternate section to use in place of these.Johnston, Judith L
07/14/2014 10:22 AMPROJECT QUESTION: On plan sheets 77, 79, and 80 of the typical sections, there is a callout for Lightweight Concrete (Subgrade). Could you clarify where this work is covered in the bid form?Johnston, Judith L
07/11/2014 12:33 PMPROJECT QUESTION: The tonnages for bituminous pavement called for in the plans appear to be incorrect. Mixes (4,F) and (4,B) look like they include only half as much as would be needed based on the typical sections and the 55,000 sq yd removal quantity?Johnston, Judith L
07/11/2014 11:36 AMPROJECT QUESTION: On Sheet 389, what type of mesh is needed for the Type 3 railing? Also on the same sheet, what material is being prescribed for the top rail? Saw notes for both wood and stainless steel.Johnston, Judith L
07/11/2014 11:31 AMPROJECT QUESTION: The bid item 183, Ductile Iron Fittings, what portion of the project is this covering? Is this for 24-inch MCES fittings? Or is it 8-inch or 4-inch forcemain?Johnston, Judith L
07/10/2014 8:12 AMPROJECT QUESTION: Clarify the area calculation for Steel Sheet Piling (Temporary) . . . Johnston, Judith L
07/10/2014 8:10 AMPROJECT QUESTION: Regarding wall D2 as a whole - the takeoff SF area difference?Johnston, Judith L
07/10/2014 8:08 AMPROJECT QUESTION: Concerning Panel R1 and other panels sheet pile wall area?Johnston, Judith L
07/10/2014 8:02 AMPROJECT QUESTION: Which items are to be included in the bid item Salvage and Haul Material (Bridge)?Johnston, Judith L
07/10/2014 7:59 AMPROJECT QUESTION: A 28 inch Span Arch is indicated as IV-A in the SEQ . . . Johnston, Judith L
07/09/2014 3:06 PMPROJECT QUESTION: How is the 1/4 inch steel closure plate to be connected to the top of sheet piling?Johnston, Judith L
07/09/2014 7:49 AMPROJECT QUESTION: Is Structural Concrete Special equal to Lightweight Cellular Concrete?Johnston, Judith L
07/09/2014 7:47 AMPROJECT QUESTION: MCES Special Provisions - grout for annular space . . . Johnston, Judith L
07/08/2014 3:10 PMPROJECT QUESTION: Steel Sheet Piling - Temporary ShoringJohnston, Judith L
07/08/2014 2:23 PMPROJECT QUESTION: MCES-FM Diversion SystemJohnston, Judith L
07/08/2014 12:37 PMPROJECT QUESTION: Does this project have a Buy America clause for the permanent materials?Johnston, Judith L
07/07/2014 12:34 PMPROJECT QUESTION - Building Removals Open HouseLoos, Wayne M
07/07/2014 12:31 PMPROJECT QUESTIONSJohnston, Judith L
06/26/2014 2:40 PMPROJECT QUESTION - Item S-115, Page 186-SJohnston, Judith L
06/26/2014 2:39 PMPROJECT QUESTION - Item S-108.4, Page 177-SJohnston, Judith L