06/24/2020 4:15 PMPROJECT QUESTION: The main bid uses 2 different types of signs: (See all parts below)Johnston, Judith L
06/24/2020 4:13 PMPROJECT QUESTION: The Alt bids include installs, but the sign types and sizes not specified in the plansJohnston, Judith L
06/24/2020 4:12 PMPROJECT QUESTION: From what I can tell, all Removals are on ground posts either in cement or dirt. (none hanging from street lights or wires). Is this correct? Also, for the removals in the cement, can they be cut off level to the ground or do they need to be pulled? Johnston, Judith L
02/11/2020 3:41 PMPROJECT QUESTION: Sheet B9 of the bridge plans refer to three different types of diaphragms on the plans, but doesn’t describe what is to be done with them? Are they to be replaced? If so, where is it paid for?Johnston, Judith L
01/12/2018 2:48 PMPROJECT QUESTION: What Pay item is the Temp Pvmt Marking getting paid for in the temp traffic control plans?Johnston, Judith L
10/13/2017 9:35 AMPROJECT QUESTION: Could you tell me if you want Type I or Type II RC dissipaters on this project?Johnston, Judith L
10/13/2017 9:32 AMPROJECT QUESTION: Could you tell me if you want Type I or Type II RC dissipaters on this project?Johnston, Judith L
10/13/2017 9:30 AMPROJECT QUESTION: There appears to be an error in the quantity for pay item ARCH SURFACE FINISH (MULTICOLOR).Johnston, Judith L
10/03/2017 1:10 PMPRE-BIDDING CONFERENCE - MONDAY, OCTOBER 16, 2017Johnston, Judith L
01/16/2015 2:09 PMPROJECT QUESTIONSJohnston, Judith L
06/23/2014 9:33 AMPROJECT QUESTIONSJohnston, Judith L
12/10/2012 10:06 AMIs crushing allowed on the project?Johnston, Judith L
12/10/2012 10:04 AMWater Service Disconnects?Johnston, Judith L
12/03/2012 11:34 AMIn lieu of 36 inch Steel casing for the pipe jacking, would we be able to use 36 inch RCP Jacking Pipe for the casing?Johnston, Judith L
04/06/2012 10:53 AMOur bid bond is Surepath not Surety2000, so does that mean we do not have to submit a bid bond?Mortenson, Jerry
06/16/2011 9:50 AMPre-letting ConferenceMortenson, Jerry
02/17/2011 11:26 AMQuesetion: On page 26-SS, existing pole, arm and luminaire extension to be sandblasted clean . . . Johnston, Judith L
02/16/2011 1:32 PMQuestion on plan sheets 54 and 55 - 24" watermain to be abandoned (2104.603).Johnston, Judith L