Hennepin County

Welcome, Guest!
Log in | Employee Login | License
 

Bid Abstract

2183304 - CSAH 92 Culvert ReplacementValley Paving Inc Minger Construction Co. Inc. Meyer Contracting Inc. New Look Contracting, Inc. G.F. Jedlicki, Inc. Thomas & Sons Construction, INC. Blackstone Contractors, LLC 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$21,878.20$21,878.20$35,000.00$35,000.00$18,000.00$18,000.00$20,000.00$20,000.00$18,500.00$18,500.00$70,200.00$70,200.00$64,726.00$64,726.00
2101.505CLEARINGACRE0.2$16,000.00$3,200.00$17,000.00$3,400.00$15,000.00$3,000.00$45,000.00$9,000.00$53,000.00$10,600.00$44,000.00$8,800.00$13,000.00$2,600.00
2101.505GRUBBINGACRE0.2$1,100.00$220.00$1,150.00$230.00$1,000.00$200.00$29,000.00$5,800.00$53,000.00$10,600.00$44,000.00$8,800.00$13,000.00$2,600.00
2104.502REMOVE ENERGY ABSORBING TERMINALEACH1$1,060.00$1,060.00$454.00$454.00$1,000.00$1,000.00$460.00$460.00$950.00$950.00$1,100.00$1,100.00$400.00$400.00
2104.502REMOVE SIGN TYPE DEACH1$45.00$45.00$85.00$85.00$40.00$40.00$46.00$46.00$105.00$105.00$85.00$85.00$205.00$205.00
2104.502SALVAGE SIGN TYPE CEACH4$45.00$180.00$40.00$160.00$40.00$160.00$46.00$184.00$60.00$240.00$40.00$160.00$67.50$270.00
2104.502REMOVE SIGN TYPE CEACH8$45.00$360.00$40.00$320.00$40.00$320.00$46.00$368.00$60.00$480.00$40.00$320.00$35.00$280.00
2104.502REMOVE PIPE APRONEACH5$400.00$2,000.00$350.00$1,750.00$243.00$1,215.00$750.00$3,750.00$900.00$4,500.00$1,100.00$5,500.00$260.00$1,300.00
2104.503REMOVE PIPE CULVERTSLIN FT228$18.00$4,104.00$10.00$2,280.00$28.00$6,384.00$28.00$6,384.00$14.00$3,192.00$20.00$4,560.00$114.00$25,992.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT154$4.00$616.00$7.00$1,078.00$3.80$585.20$3.00$462.00$5.00$770.00$8.00$1,232.00$6.75$1,039.50
2104.503REMOVE GUARDRAILLIN FT201$6.00$1,206.00$7.00$1,407.00$5.00$1,005.00$7.00$1,407.00$8.00$1,608.00$5.75$1,155.75$6.27$1,260.27
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD1,039$13.00$13,507.00$6.00$6,234.00$8.65$8,987.35$10.00$10,390.00$7.00$7,273.00$11.00$11,429.00$11.26$11,699.14
2106.507COMMON EMBANKMENT (CV)CU YD1,222$22.00$26,884.00$37.00$45,214.00$39.25$47,963.50$22.00$26,884.00$23.00$28,106.00$15.00$18,330.00$34.86$42,598.92
2106.507EXCAVATION - COMMONCU YD18$67.00$1,206.00$85.00$1,530.00$244.00$4,392.00$65.00$1,170.00$48.00$864.00$100.00$1,800.00$72.22$1,299.96
2118.507AGGREGATE SURFACING (CV) CLASS 2CU YD18$170.00$3,060.00$79.50$1,431.00$224.50$4,041.00$66.00$1,188.00$47.00$846.00$80.00$1,440.00$61.11$1,099.98
2123.610STREET SWEEPER (WITH PICKUP BROOM)HOUR10$180.00$1,800.00$142.00$1,420.00$150.00$1,500.00$180.00$1,800.00$110.00$1,100.00$1.00$10.00$130.00$1,300.00
2211.507AGGREGATE BASE (CV) CLASS 5CU YD323$50.00$16,150.00$40.00$12,920.00$93.50$30,200.50$55.00$17,765.00$38.00$12,274.00$44.50$14,373.50$44.74$14,451.02
2360.509TYPE SP 12.5 NON WEAR COURSE MIX (4;F)TON598$93.00$55,614.00$112.00$66,976.00$84.00$50,232.00$100.00$59,800.00$128.00$76,544.00$99.00$59,202.00$83.61$49,998.78
2360.509TYPE SP 12.5 WEARING COURSE MIX (4;F)TON239$113.00$27,007.00$130.00$31,070.00$98.25$23,481.75$120.00$28,680.00$128.00$30,592.00$116.50$27,843.50$104.00$24,856.00
2501.50224" RC PIPE APRONEACH3$1,700.00$5,100.00$1,033.00$3,099.00$1,913.25$5,739.75$1,400.00$4,200.00$2,950.00$8,850.00$1,400.00$4,200.00$947.00$2,841.00
2501.50230" RC PIPE APRONEACH1$2,600.00$2,600.00$1,764.00$1,764.00$2,164.25$2,164.25$1,500.00$1,500.00$3,865.00$3,865.00$1,900.00$1,900.00$1,265.00$1,265.00
2503.50324" RC PIPE SEWER CLASS VLIN FT231$99.00$22,869.00$202.00$46,662.00$193.85$44,779.35$180.00$41,580.00$128.00$29,568.00$207.00$47,817.00$115.80$26,749.80
2503.50318" RC PIPE SEWER CLASS VLIN FT38$76.00$2,888.00$140.00$5,320.00$113.60$4,316.80$150.00$5,700.00$82.00$3,116.00$177.00$6,726.00$90.80$3,450.40
2503.50330" RC PIPE SEWER CLASS VLIN FT103$145.00$14,935.00$238.00$24,514.00$255.85$26,352.55$210.00$21,630.00$184.00$18,952.00$267.00$27,501.00$196.12$20,200.36
2503.602CONNECT TO EXISTING STORM SEWEREACH1$1,500.00$1,500.00$4,000.00$4,000.00$1,321.00$1,321.00$1,000.00$1,000.00$1,755.00$1,755.00$3,000.00$3,000.00$1,340.00$1,340.00
2506.503CONST DRAINAGE STRUCTURE DES 60-4020LIN FT10.5$900.00$9,450.00$1,100.00$11,550.00$835.75$8,775.38$720.00$7,560.00$620.00$6,510.00$1,300.00$13,650.00$734.00$7,707.00
2511.504GEOTEXTILE FILTER TYPE 4SQ YD92$4.00$368.00$3.50$322.00$4.40$404.80$2.00$184.00$4.00$368.00$10.00$920.00$15.76$1,449.92
2511.507RANDOM RIPRAP CLASS IVCU YD33$145.00$4,785.00$111.00$3,663.00$199.50$6,583.50$150.00$4,950.00$110.00$3,630.00$175.00$5,775.00$158.80$5,240.40
2511.507GRANULAR FILTERCU YD3$155.00$465.00$50.00$150.00$244.60$733.80$110.00$330.00$61.00$183.00$115.00$345.00$76.67$230.01
2533.503RELOCATE PORT PRECAST CONC BAR DES 8337LIN FT75$5.00$375.00$11.00$825.00$10.00$750.00$11.00$825.00$20.00$1,500.00$12.00$900.00$13.90$1,042.50
2533.503PORTABLE PRECAST CONC BARRIER DES 8337LIN FT75$20.00$1,500.00$17.00$1,275.00$16.00$1,200.00$18.00$1,350.00$25.00$1,875.00$18.00$1,350.00$22.00$1,650.00
2554.502END TREATMENT-TANGENT TERMINALEACH1$3,900.00$3,900.00$4,198.00$4,198.00$3,668.00$3,668.00$4,300.00$4,300.00$4,440.00$4,440.00$4,100.00$4,100.00$3,800.00$3,800.00
2554.502GUIDE POST TYPE BEACH4$65.00$260.00$96.00$384.00$60.00$240.00$69.00$276.00$250.00$1,000.00$100.00$400.00$375.00$1,500.00
2554.503TRAFFIC BARRIER DESIGN TYPE 31LIN FT150$23.00$3,450.00$31.50$4,725.00$21.00$3,150.00$32.00$4,800.00$33.00$4,950.00$24.00$3,600.00$27.80$4,170.00
2563.601TRAFFIC CONTROLLUMP SUM1$5,500.00$5,500.00$12,000.00$12,000.00$4,500.00$4,500.00$5,200.00$5,200.00$28,650.00$28,650.00$15,000.00$15,000.00$9,000.00$9,000.00
2563.601TRAFFIC CONTROL SUPERVISORLUMP SUM1$1,100.00$1,100.00$2,500.00$2,500.00$1,000.00$1,000.00$1,150.00$1,150.00$3,650.00$3,650.00$3,000.00$3,000.00$2,510.00$2,510.00
2563.613TYPE III BARRICADESUNIT DAY6$11.00$66.00$3.00$18.00$10.00$60.00$11.00$66.00$5.00$30.00$5.00$30.00$2.50$15.00
2563.613FLASHER TYPE B (HIGH INTENSITY)UNIT DAY6$11.00$66.00$1.50$9.00$10.00$60.00$12.00$72.00$4.00$24.00$2.00$12.00$100.00$600.00
2563.618CONSTRUCTION SIGN-SPECIALSQ FT245$22.00$5,390.00$2.00$490.00$20.00$4,900.00$23.00$5,635.00$2.00$490.00$2.00$490.00$1.22$298.90
2564.502INSTALL SIGN TYPE CEACH4$225.00$900.00$39.00$156.00$200.00$800.00$230.00$920.00$75.00$300.00$40.00$160.00$37.50$150.00
2564.502INSTALL SIGN TYPE DEACH1$270.00$270.00$170.00$170.00$250.00$250.00$290.00$290.00$370.00$370.00$165.00$165.00$410.00$410.00
2564.518SIGN PANELS TYPE DSQ FT35$59.00$2,065.00$68.00$2,380.00$55.00$1,925.00$63.00$2,205.00$97.00$3,395.00$66.00$2,310.00$60.00$2,100.00
2564.518SIGN PANELS TYPE CSQ FT40.2$59.00$2,371.80$70.00$2,814.00$55.00$2,211.00$63.00$2,532.60$100.00$4,020.00$69.00$2,773.80$62.20$2,500.44
2573.502CULVERT END CONTROLSEACH4$100.00$400.00$142.00$568.00$200.00$800.00$330.00$1,320.00$850.00$3,400.00$250.00$1,000.00$860.00$3,440.00
2573.502STORM DRAIN INLET PROTECTIONEACH2$300.00$600.00$142.00$284.00$106.00$212.00$250.00$500.00$270.00$540.00$150.00$300.00$180.00$360.00
2573.503SILT FENCE; TYPE HILIN FT576$3.00$1,728.00$5.50$3,168.00$4.60$2,649.60$10.00$5,760.00$3.00$1,728.00$5.00$2,880.00$6.70$3,859.20
2573.503SEDIMENT CONTROL LOG TYPE WOOD FIBERLIN FT220$4.00$880.00$3.40$748.00$3.50$770.00$10.00$2,200.00$4.00$880.00$4.00$880.00$6.10$1,342.00
2574.505SOIL BED PREPARATIONACRE0.2$140.00$28.00$2,500.00$500.00$1,250.00$250.00$1,000.00$200.00$5,760.00$1,152.00$1,400.00$280.00$13,000.00$2,600.00
2574.507ORGANIC TOPSOIL BORROWCU YD895$44.00$39,380.00$5.00$4,475.00$39.50$35,352.50$55.00$49,225.00$34.00$30,430.00$22.00$19,690.00$45.60$40,812.00
2574.508FERTILIZER TYPE 3LB60$1.00$60.00$1.50$90.00$1.70$102.00$2.00$120.00$2.55$153.00$2.00$120.00$14.83$889.80
2575.504COMPOST BLANKETSQ YD550$2.50$1,375.00$4.00$2,200.00$4.00$2,200.00$8.00$4,400.00$11.00$6,050.00$4.50$2,475.00$3.60$1,980.00
2575.504EROSION CONTROL BLANKETS CATEGORY 3NSQ YD910$1.50$1,365.00$3.40$3,094.00$1.60$1,456.00$3.50$3,185.00$4.75$4,322.50$2.00$1,820.00$2.25$2,047.50
2575.508SEED MIXTURE 25-141POUND18$4.00$72.00$11.50$207.00$3.50$63.00$11.00$198.00$22.00$396.00$4.00$72.00$45.60$820.80
2582.5036" SOLID LINE PAINTLIN FT760$1.00$760.00$0.80$608.00$0.69$524.40$4.00$3,040.00$1.00$760.00$0.80$608.00$7.25$5,510.00
2582.5034" DBLE SOLID LINE PAINTLIN FT400$1.00$400.00$1.00$400.00$0.91$364.00$3.00$1,200.00$1.20$480.00$1.10$440.00$20.50$8,200.00
 Totals for project 2183304 $319,319.00 $362,289.00 $373,335.98 $385,141.60 $390,926.50 $413,030.55 $420,058.60
 
Contract Total:$319,319.00$362,289.00$373,335.98$385,141.60$390,926.50$413,030.55$420,058.60