Bid Abstract

2092500 - Reconstruct 3rd Ave N by Target Field (Sponsorship for MN Ballpark Auth)Veit & Company, Inc. Midwest Asphalt Corporation Thomas & Sons Construction, INC. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2011.601CONSTRUCTION SURVEYINGLUMP SUM1$6,600.00$6,600.00$6,000.00$6,000.00$20,500.00$20,500.00
2021.501MOBILIZATIONLUMP SUM1$99,750.00$99,750.00$20,000.00$20,000.00$496,000.00$496,000.00
2031.501FIELD OFFICE TYPE DEACH1$0.00$0.00$9,500.00$9,500.00$25,000.00$25,000.00
2101.511CLEARING AND GRUBBINGLUMP SUM1$500.00$500.00$800.00$800.00$4,500.00$4,500.00
2104.501REMOVE FENCE (P)LIN FT34$35.00$1,190.00$19.00$646.00$15.00$510.00
2104.501REMOVE CURB AND GUTTERLIN FT1,380$2.75$3,795.00$6.00$8,280.00$10.74$14,821.20
2104.501REMOVE SEWER PIPE (STORM)LIN FT35$15.00$525.00$21.00$735.00$20.00$700.00
2104.501REMOVE CONCRETE CURBLIN FT270$3.00$810.00$6.00$1,620.00$3.00$810.00
2104.503REMOVE CONCRETE DRIVEWAY PAVEMENTSQ FT590$1.50$885.00$1.50$885.00$2.00$1,180.00
2104.503REMOVE CONCRETE WALKSQ FT10,020$0.30$3,006.00$0.75$7,515.00$2.50$25,050.00
2104.505REMOVE BITUMINOUS PAVEMENTSQ YD1,415$2.00$2,830.00$10.00$14,150.00$23.14$32,743.10
2104.509REMOVE HANDHOLEEACH3$220.00$660.00$125.00$375.00$300.00$900.00
2104.509REMOVE SIGN TYPE CEACH8$40.00$320.00$60.00$480.00$100.00$800.00
2104.509REMOVE CASTINGEACH4$150.00$600.00$90.00$360.00$250.00$1,000.00
2104.509REMOVE LIGHT BASEEACH7$210.00$1,470.00$175.00$1,225.00$500.00$3,500.00
2104.509REMOVE MANHOLE OR CATCH BASINEACH1$725.00$725.00$580.00$580.00$500.00$500.00
2104.513SAWING BIT PAVEMENT (FULL DEPTH)LIN FT900$4.50$4,050.00$4.00$3,600.00$5.00$4,500.00
2104.523SALVAGE SIGN TYPE CEACH2$40.00$80.00$100.00$200.00$60.00$120.00
2104.523SALVAGE LIGHT STANDARD & LUMINAIREEACH6$3.35$20.10$300.00$1,800.00$345.00$2,070.00
2104.601REMOVE SPRINKLER SYSTEMLUMP SUM1$1,500.00$1,500.00$700.00$700.00$5,000.00$5,000.00
2105.501COMMON EXCAVATION (P)CU YD925$10.00$9,250.00$32.00$29,600.00$40.81$37,749.25
2105.526SELECT TOPSOIL BORROW (CV)CU YD57$30.00$1,710.00$62.00$3,534.00$55.00$3,135.00
2105.607STRUCTURAL SOIL BORROW (CV)CU YD260$90.00$23,400.00$130.00$33,800.00$176.00$45,760.00
2123.610STREET SWEEPER (WITH PICKUP BROOM)HOUR30$135.00$4,050.00$125.00$3,750.00$150.00$4,500.00
2211.503AGGREGATE BASE (CV) CLASS 5CU YD200$31.00$6,200.00$53.00$10,600.00$80.00$16,000.00
2231.501BITUMINOUS PATCHING MIXTURETONS300$107.25$32,175.00$120.00$36,000.00$125.00$37,500.00
2232.501MILL BITUMINOUS SURFACE (2.0")SQ YD2,900$1.00$2,900.00$3.50$10,150.00$3.00$8,700.00
2301.501CONCRETE PAVEMENTSQ YD860$64.95$55,857.00$51.00$43,860.00$71.08$61,128.80
2301.541INTEGRANT CURB DESIGN B6LIN FT670$23.90$16,013.00$15.00$10,050.00$19.45$13,031.50
2301.6021.25" DOWEL BAREACH610$16.00$9,760.00$15.00$9,150.00$14.85$9,058.50
2357.502BITUMINOUS MATERIAL FOR TACK COATGALLON970$3.90$3,783.00$4.00$3,880.00$4.05$3,928.50
2360.501TYPE SP 12.5 WEARING COURSE MIX (5,L)TON500$74.00$37,000.00$80.00$40,000.00$98.00$49,000.00
2433.501STRUCTURE REMOVALSLUMP SUM1$1,500.00$1,500.00$3,200.00$3,200.00$2,500.00$2,500.00
2451.501STRUCTURE EXCAVATION CLASS ECU YD3$140.00$420.00$160.00$480.00$1,000.00$3,000.00
2461.501CONCRETE MIX NO. 3A21CU YD200$160.00$32,000.00$170.00$34,000.00$244.50$48,900.00
2502.5414" PERF PE PIPE DRAINLIN FT770$3.50$2,695.00$25.00$19,250.00$26.00$20,020.00
2503.54112" RC PIPE SEWER DES 3006LIN FT36$35.00$1,260.00$56.00$2,016.00$150.00$5,400.00
2504.602RELOCATE HYDRANTEACH1$2,200.00$2,200.00$9,900.00$9,900.00$8,500.00$8,500.00
2504.6036" WATERMAIN DUCTILE IRON CL 52LIN FT11$85.00$935.00$50.00$550.00$150.00$1,650.00
2506.502CONST DRAINAGE STRUCTURE DESIGN GEACH2$1,600.00$3,200.00$3,100.00$6,200.00$3,000.00$6,000.00
2506.502CONST DRAINAGE STRUCTURE DESIGN NEACH3$900.00$2,700.00$3,800.00$11,400.00$2,800.00$8,400.00
2506.516CASTING ASSEMBLYEACH4$600.00$2,400.00$530.00$2,120.00$800.00$3,200.00
2506.522ADJUST FRAME & RING CASTINGEACH8$120.00$960.00$490.00$3,920.00$500.00$4,000.00
2506.602CONNECT INTO EXISTING MANHOLEEACH3$700.00$2,100.00$580.00$1,740.00$1,100.00$3,300.00
2506.602CONNECT INTO EXISTING STORM SEWEREACH1$700.00$700.00$465.00$465.00$650.00$650.00
2521.5016" CONCRETE WALKSQ FT4,800$6.15$29,520.00$9.25$44,400.00$11.47$55,056.00
2521.5013.5" CONCRETE WALKSQ FT15,510$4.95$76,774.50$7.20$111,672.00$8.67$134,471.70
2521.5113" BITUMINOUS WALKSQ FT850$0.01$8.50$3.50$2,975.00$6.50$5,525.00
2521.603SAWING CONCRETE WALKLIN FT50$3.00$150.00$6.00$300.00$8.00$400.00
2531.501CONCRETE CURB & GUTTER DESIGN B624LIN FT940$24.15$22,701.00$19.00$17,860.00$28.50$26,790.00
2531.502CONCRETE CURB DESIGN V6LIN FT400$22.00$8,800.00$30.00$12,000.00$51.50$20,600.00
2531.502CONCRETE CURB DESIGN V8LIN FT80$31.30$2,504.00$32.00$2,560.00$51.50$4,120.00
2531.5078" CONCRETE DRIVEWAY PAVEMENTSQ YD180$80.40$14,472.00$82.00$14,760.00$72.50$13,050.00
2531.618TRUNCATED DOMESSQ FT180$33.50$6,030.00$41.00$7,380.00$50.00$9,000.00
2540.602BIKE RACK 5 LOOPEACH5$735.00$3,675.00$900.00$4,500.00$3,200.00$16,000.00
2540.602RELOCATE MAIL BOX SUPPORTEACH1$0.01$0.01$320.00$320.00$400.00$400.00
2540.602BIKE RACK 4 LOOPEACH4$570.00$2,280.00$900.00$3,600.00$2,595.00$10,380.00
2540.602WASTE RECEPTACLEEACH9$500.00$4,500.00$950.00$8,550.00$2,600.00$23,400.00
2540.603LANDSCAPE EDGERLIN FT17$6.00$102.00$7.00$119.00$20.00$340.00
2545.511LIGHTING UNIT TYPE SPECIAL 1EACH8$4,310.00$34,480.00$4,200.00$33,600.00$5,725.00$45,800.00
2545.515LIGHT BASE DESIGN SPECIAL 1EACH8$640.00$5,120.00$820.00$6,560.00$661.00$5,288.00
2545.5232" NON-METALLIC CONDUITLIN FT1,144$3.10$3,546.40$11.00$12,584.00$3.25$3,718.00
2545.5232" NON-METALLIC COND (DIRECTIONAL BORE)LIN FT40$55.40$2,216.00$30.00$1,200.00$57.50$2,300.00
2545.531UNDERGROUND WIRE 1 COND NO 4LIN FT3,972$1.65$6,553.80$1.70$6,752.40$1.75$6,951.00
2545.531UNDERGROUND WIRE 1 COND NO 8LIN FT1,324$1.55$2,052.20$0.80$1,059.20$1.55$2,052.20
2545.553HANDHOLEEACH1$665.00$665.00$620.00$620.00$675.00$675.00
2550.603REMOVE CONDUITLIN FT1,780$0.85$1,513.00$0.45$801.00$1.00$1,780.00
2563.601TRAFFIC CONTROLLUMP SUM1$6,000.00$6,000.00$13,000.00$13,000.00$33,500.00$33,500.00
2563.613PORTABLE CHANGEABLE MESSAGE SIGNUNIT DAY50$110.00$5,500.00$115.00$5,750.00$150.00$7,500.00
2564.531SIGN PANELS TYPE CSQ FT50$39.00$1,950.00$35.00$1,750.00$35.00$1,750.00
2564.537INSTALL SIGN TYPE CEACH15$170.00$2,550.00$100.00$1,500.00$100.00$1,500.00
2564.613REFLECTORIZED PLASTIC SAFETY DRUMUDAY5,000$0.85$4,250.00$1.00$5,000.00$1.00$5,000.00
2564.613TYPE III BARRICADE DIAMOND GRADEUDAY300$2.25$675.00$2.25$675.00$4.00$1,200.00
2565.602ADJUST HANDHOLEEACH8$180.00$1,440.00$280.00$2,240.00$8.00$64.00
2571.502DECIDUOUS TREE 3" CAL B&BTREE21$225.00$4,725.00$360.00$7,560.00$350.00$7,350.00
2571.503ORNAMENTAL TREE 2" CAL B&BTREE1$150.00$150.00$175.00$175.00$250.00$250.00
2571.504CONIFEROUS SHRUB 18" SPREAD CONTSHRUB36$35.00$1,260.00$35.00$1,260.00$50.00$1,800.00
2571.505DECIDUOUS SHRUB NO 5 CONTSHRUB28$24.00$672.00$40.00$1,120.00$40.00$1,120.00
2571.506VINES 2 YR NO 2 CONTVINE12$20.00$240.00$30.00$360.00$40.00$480.00
2571.507PERENNIAL NO 1 CONTPLANT212$8.60$1,823.20$12.00$2,544.00$15.00$3,180.00
2571.602TREE GRATE & FRAMESEACH21$1,200.00$25,200.00$1,700.00$35,700.00$1,750.00$36,750.00
2573.530STORM DRAIN INLET PROTECTIONEACH10$170.00$1,700.00$230.00$2,300.00$350.00$3,500.00
2573.602TEMPORARY ROCK CONSTRUCTION ENTRANCEEACH2$980.00$1,960.00$1,500.00$3,000.00$2,000.00$4,000.00
2575.513MULCH MATERIAL TYPE 6CU YD22$65.00$1,430.00$55.00$1,210.00$60.00$1,320.00
2575.523EROSION CONTROL BLANKETS CATEGORY 2SQ YD200$3.90$780.00$2.00$400.00$2.50$500.00
2575.550COMPOST, GRADE 2CU YD12$83.00$996.00$40.00$480.00$40.00$480.00
2575.604SEEDINGSQ YD200$1.10$220.00$5.00$1,000.00$3.00$600.00
2582.501PAVT MSSG (THRU ARROW) POLY PREFEACH1$450.00$450.00$415.00$415.00$405.00$405.00
2582.501PAVT MSSG (LT-THRU ARROW) POLY PREFEACH1$900.00$900.00$525.00$525.00$820.00$820.00
2582.501PAVT MSSG (HOV DIAMOND) POLY PREFEACH1$400.00$400.00$310.00$310.00$305.00$305.00
2582.5028" SOLID LINE WHITE-POLY PREFLIN FT150$11.50$1,725.00$6.40$960.00$7.00$1,050.00
2582.5026" SOLID LINE WHITE - EPOXYLIN FT150$22.15$3,322.50$24.00$3,600.00$25.00$3,750.00
2582.5024" BROKEN LINE WHITE-POLY PREFLIN FT150$5.75$862.50$3.20$480.00$3.25$487.50
2582.5024" SOLID LINE WHITE-POLY PREFLIN FT400$5.75$2,300.00$3.20$1,280.00$3.25$1,300.00
2582.5024" BROKEN LINE WHITE-EPOXYLIN FT150$22.15$3,322.50$24.00$3,600.00$25.00$3,750.00
2582.50212" SOLID LINE WHITE-POLY PREFLIN FT160$17.30$2,768.00$9.60$1,536.00$10.00$1,600.00
2582.503CROSSWALK MARKING-POLY PREFORMSQ FT575$17.30$9,947.50$16.00$9,200.00$16.50$9,487.50
 Totals for project 2092500 $701,666.71 $812,168.60 $1,568,111.75
 
Contract Total:$701,666.71$812,168.60$1,568,111.75