2974200 - CSAH 48 (Minnehaha Ave) Road Reconstruction in MinneapolisMax Steininger Inc Thomas & Sons Construction, INC. C S McCrossan Construction, Inc. Bituminous Roadways, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$2,209,012.00$2,209,012.00$747,750.00$747,750.00$850,000.00$850,000.00$1,500,000.00$1,500,000.00
2031.501FIELD OFFICE TYPE DEACH1$35,527.75$35,527.75$70,000.00$70,000.00$90,000.00$90,000.00$50,000.00$50,000.00
2031.503FIELD LABORATORY TYPE DXEACH1$10,724.14$10,724.14$15,000.00$15,000.00$30,000.00$30,000.00$30,000.00$30,000.00
2101.502CLEARINGTREE53$266.50$14,124.50$450.00$23,850.00$350.00$18,550.00$275.00$14,575.00
2101.507GRUBBINGTREE55$266.50$14,657.50$125.00$6,875.00$300.00$16,500.00$275.00$15,125.00
2102.501PAVEMENT MARKING REMOVALS F1,240$1.92$2,380.80$1.60$1,984.00$2.00$2,480.00$2.00$2,480.00
2102.502PAVEMENT MARKING REMOVALL F5,000$0.64$3,200.00$0.64$3,200.00$0.70$3,500.00$0.65$3,250.00
2103.507DISCONNECT WATER SERVICEEACH23$2,132.03$49,036.69$1,800.00$41,400.00$3,500.00$80,500.00$1,562.60$35,939.80
2104.501REMOVE CURB & GUTTERL F264$7.98$2,106.72$6.50$1,716.00$7.00$1,848.00$6.35$1,676.40
2104.501REMOVE WOOD RETAINING WALLL F105$13.84$1,453.20$20.00$2,100.00$10.00$1,050.00$51.10$5,365.50
2104.501REMOVE WOOD EDGERL F194$8.87$1,720.78$5.00$970.00$1.25$242.50$4.40$853.60
2104.501REMOVE SEWER PIPE (STORM)L F6,356$15.99$101,632.44$8.00$50,848.00$15.00$95,340.00$13.80$87,712.80
2104.501REMOVE CONCRETE CURBL F1,930$4.43$8,549.90$4.50$8,685.00$3.00$5,790.00$4.45$8,588.50
2104.501REMOVE STREETCAR TRACKSL F24,154$9.03$218,110.62$4.50$108,693.00$10.25$247,578.50$45.00$1,086,930.00
2104.501REMOVE FENCEL F43$14.92$641.56$15.00$645.00$20.00$860.00$11.05$475.15
2104.501REMOVE CONCRETE ENCASED CONDUIT TRANSITELIN FT11,649$6.95$80,960.55$1.75$20,385.75$9.30$108,335.70$11.45$133,381.05
2104.501REMOVE RAILROAD TRACKL F50$26.65$1,332.50$50.00$2,500.00$25.00$1,250.00$95.90$4,795.00
2104.501REMOVE WATER MAINL F465$9.06$4,212.90$10.00$4,650.00$15.00$6,975.00$23.45$10,904.25
2104.501REMOVE UNDERGROUND WIREL F2,300$0.85$1,955.00$0.80$1,840.00$0.71$1,633.00$0.70$1,610.00
2104.501REMOVE CONCRETE BLOCK WALLL F6$44.41$266.46$100.00$600.00$100.00$600.00$422.50$2,535.00
2104.503REMOVE BITUMINOUS DRIVEWAY PAVEMENTS F2,838$1.04$2,951.52$5.00$14,190.00$1.50$4,257.00$0.70$1,986.60
2104.503REMOVE CONCRETE WALKS F95,157$0.95$90,399.15$0.75$71,367.75$0.80$76,125.60$1.00$95,157.00
2104.505REMOVE PAVEMENT (SPECIAL)SQ YD26,909$12.62$339,591.58$9.50$255,635.50$11.00$295,999.00$9.75$262,362.75
2104.505REMOVE PAVEMENTS Y62,270$8.59$534,899.30$9.30$579,111.00$9.50$591,565.00$7.15$445,230.50
2104.505REMOVE CONCRETE DRIVEWAY PAVEMENTS Y1,868$9.70$18,119.60$9.50$17,746.00$8.00$14,944.00$12.85$24,003.80
2104.505REMOVE CONCRETE PAVEMENTS Y2,320$10.07$23,362.40$9.50$22,040.00$9.00$20,880.00$10.45$24,244.00
2104.509REMOVE MANHOLE OR CATCH BASINEACH139$319.80$44,452.20$425.00$59,075.00$330.00$45,870.00$937.60$130,326.40
2104.509REMOVE GATE VALVE & BOXEACH10$1,998.78$19,987.80$450.00$4,500.00$250.00$2,500.00$937.60$9,376.00
2104.509REMOVE CONTROLLER FOUNDATIONEACH6$292.16$1,752.96$400.00$2,400.00$400.00$2,400.00$600.00$3,600.00
2104.509REMOVE SERVICE EQUIPMENTEACH2$373.11$746.22$350.00$700.00$290.00$580.00$275.80$551.60
2104.509REMOVE HYDRANTEACH11$1,998.78$21,986.58$550.00$6,050.00$1,100.00$12,100.00$937.60$10,313.60
2104.509REMOVE MANHOLEEACH8$319.80$2,558.40$550.00$4,400.00$550.00$4,400.00$937.60$7,500.80
2104.509REMOVE MAST ARM FOUNDATIONEACH1$451.92$451.92$1,650.00$1,650.00$750.00$750.00$600.00$600.00
2104.509REMOVE POSTEACH3$26.65$79.95$26.75$80.25$200.00$600.00$207.30$621.90
2104.509REMOVE PLANTEREACH1$651.04$651.04$500.00$500.00$550.00$550.00$311.00$311.00
2104.509REMOVE LIGHT FOUNDATIONEACH18$432.78$7,790.04$600.00$10,800.00$400.00$7,200.00$600.00$10,800.00
2104.509REMOVE PEDESTAL FOUNDATIONEACH28$263.00$7,364.00$325.00$9,100.00$400.00$11,200.00$600.00$16,800.00
2104.511SAWING CONCRETE PAVEMENT (FULL DEPTH)L F1,933$3.92$7,577.36$7.50$14,497.50$5.00$9,665.00$4.40$8,505.20
2104.513SAWING BIT PAVEMENT (FULL DEPTH)L F2,085$1.97$4,107.45$5.50$11,467.50$2.00$4,170.00$4.40$9,174.00
2104.513SAWING BITUMINOUS PAVEMENTL F142$1.97$279.74$5.50$781.00$2.00$284.00$4.40$624.80
2104.521SALVAGE FENCEL F112$6.77$758.24$15.00$1,680.00$55.00$6,160.00$38.60$4,323.20
2104.523SALVAGE SERVICE EQUIPMENTEACH5$282.49$1,412.45$265.00$1,325.00$270.00$1,350.00$255.90$1,279.50
2104.523SALVAGE MAST ARM POLEEACH1$852.82$852.82$800.00$800.00$1,700.00$1,700.00$1,613.80$1,613.80
2104.523SALVAGE CONTROLLER & CABINETEACH6$426.40$2,558.40$400.00$2,400.00$480.00$2,880.00$462.20$2,773.20
2104.523SALVAGE SIGN TYPE SPECIALEACH2$26.65$53.30$26.75$53.50$100.00$200.00$27.60$55.20
2104.523SALVAGE LIGHTING UNITEACH18$266.50$4,797.00$250.00$4,500.00$270.00$4,860.00$262.50$4,725.00
2104.523SALVAGE PEDESTAL POLEEACH28$293.15$8,208.20$275.00$7,700.00$330.00$9,240.00$314.40$8,803.20
2104.523SALVAGE SIGN TYPE CEACH397$26.65$10,580.05$26.75$10,619.75$29.00$11,513.00$27.60$10,957.20
2104.523SALVAGE BOULDEREACH1$533.01$533.01$100.00$100.00$400.00$400.00$622.00$622.00
2104.602SALVAGE BICYCLE RACKEACH42$106.60$4,477.20$80.00$3,360.00$160.00$6,720.00$98.75$4,147.50
2104.602REMOVE TRANSITE HANDHOLEEACH35$578.69$20,254.15$250.00$8,750.00$750.00$26,250.00$309.50$10,832.50
2104.618REMOVE BRICK PAVERSS F320$7.76$2,483.20$3.00$960.00$1.50$480.00$2.60$832.00
2104.618REMOVE WOOD DRIVEWAYSQ FT38$8.04$305.52$15.00$570.00$10.00$380.00$16.35$621.30
2105.501COMMON EXCAVATIONC Y21,024$11.62$244,298.88$18.50$388,944.00$24.00$504,576.00$25.70$540,316.80
2105.507SUBGRADE EXCAVATIONC Y28,946$11.17$323,326.82$18.50$535,501.00$12.00$347,352.00$22.65$655,626.90
2105.521GRANULAR BORROW (CV)C Y400$21.32$8,528.00$20.00$8,000.00$30.00$12,000.00$25.40$10,160.00
2105.522SELECT GRANULAR BORROW (CV) (P)C Y34,541$0.01$345.41$19.00$656,279.00$19.60$677,003.60$25.15$868,706.15
2105.523COMMON BORROW (CV)C Y159$21.32$3,389.88$20.00$3,180.00$10.00$1,590.00$26.25$4,173.75
2105.607EXCAVATION SPECIALC Y10,000$3.80$38,000.00$8.50$85,000.00$12.00$120,000.00$22.10$221,000.00
2105.607STRUCTURAL SOIL BORROW (CV)C Y95$130.30$12,378.50$180.00$17,100.00$100.00$9,500.00$126.30$11,998.50
2105.607EXCAVATION SPECIAL 1C Y3,109$22.71$70,605.39$25.00$77,725.00$10.00$31,090.00$20.50$63,734.50
2105.609HAUL & DISPOSE OF CONTAMINATED MATERIALTON20,540$13.45$276,263.00$14.56$299,062.40$30.00$616,200.00$28.45$584,363.00
2123.610STREET SWEEPER (WITH PICKUP BROOM)HOUR151$123.34$18,624.34$200.00$30,200.00$160.00$24,160.00$145.00$21,895.00
2130.501WATERMGAL549$37.64$20,664.36$45.00$24,705.00$30.00$16,470.00$100.60$55,229.40
2131.502CALCIUM CHLORIDE SOLUTIONGAL19,165$1.67$32,005.55$1.50$28,747.50$1.00$19,165.00$2.35$45,037.75
2211.503AGGREGATE BASE (CV) CLASS 5 (P)C Y19,247$22.62$435,367.14$27.75$534,104.25$36.00$692,892.00$33.15$638,038.05
2231.604BITUMINOUS PATCH SPECIALS Y2,000$24.86$49,720.00$35.00$70,000.00$43.00$86,000.00$20.45$40,900.00
2301.504CONCRETE PAVEMENT 8.0"S Y2,463$59.48$146,499.24$64.84$159,700.92$75.00$184,725.00$82.75$203,813.25
2301.504CONCRETE PAVEMENT 10.0"S Y220$64.28$14,141.60$73.84$16,244.80$120.00$26,400.00$110.30$24,266.00
2301.504CONCRETE PAVEMENT 7.0"S Y30,857$53.24$1,642,826.68$54.83$1,691,889.31$54.00$1,666,278.00$58.45$1,803,591.65
2301.508SUPPLEMENTAL PAVEMENT REINFORCEMENTLB144$10.66$1,535.04$4.45$640.80$2.00$288.00$24.00$3,456.00
2301.6021" DOWEL BAREACH14,448$7.99$115,439.52$9.84$142,168.32$7.00$101,136.00$11.00$158,928.00
2301.6021.25" DOWEL BAREACH1,605$9.86$15,825.30$12.84$20,608.20$7.00$11,235.00$14.00$22,470.00
2331.603SAWED & SEALED JOINTL F608$5.72$3,477.76$9.15$5,563.20$13.00$7,904.00$5.90$3,587.20
2357.502BITUMINOUS MATERIAL FOR TACK COATGAL4,899$2.66$13,031.34$2.65$12,982.35$6.00$29,394.00$3.50$17,146.50
2360.501TYPE SP 12.5 WEARING COURSE MIX (3,F)TON9,702$74.71$724,836.42$74.00$717,948.00$75.00$727,650.00$83.00$805,266.00
2360.501TYPE SP 12.5 WEARING COURSE MIX (5,L)TON773$73.54$56,846.42$72.50$56,042.50$75.00$57,975.00$83.00$64,159.00
2360.502TYPE SP 12.5 NON WEAR COURSE MIX (3,B)TON7,227$64.44$465,707.88$63.75$460,721.25$63.00$455,301.00$65.00$469,755.00
2360.502TYPE SP 12.5 NON WEAR COURSE MIX (4,L)TON1,138$67.66$76,997.08$67.00$76,246.00$67.00$76,246.00$70.00$79,660.00
2360.503TYPE SP 12.5 WEAR COURSE MIX (3,F) 6.0" THICKSQ YD118$60.42$7,129.56$60.00$7,080.00$55.00$6,490.00$50.00$5,900.00
2411.507CONCRETE STEPEACH4$533.01$2,132.04$500.00$2,000.00$2,100.00$8,400.00$3,971.00$15,884.00
2411.507CONCRETE TRANSFORMER PADEACH2$3,198.06$6,396.12$450.00$900.00$1,600.00$3,200.00$943.10$1,886.20
2411.507CONCRETE BUS SHELTER BASEEACH2$6,929.12$13,858.24$6,000.00$12,000.00$7,500.00$15,000.00$1,654.60$3,309.20
2411.507CONCRETE FOOTINGEACH2$3,731.07$7,462.14$3,100.00$6,200.00$3,000.00$6,000.00$4,412.20$8,824.40
2502.5214" TP PIPE DRAINL F183$30.28$5,541.24$15.00$2,745.00$18.00$3,294.00$13.55$2,479.65
2502.5414" PERF PE PIPE DRAINL F8,850$6.80$60,180.00$8.25$73,012.50$9.20$81,420.00$10.30$91,155.00
2503.54121" RC PIPE SEWER DES 3006 CL IIIL F823$67.75$55,758.25$53.00$43,619.00$50.00$41,150.00$60.70$49,956.10
2503.54130" RC PIPE SEWER DES 3006 CL IIIL F212$85.76$18,181.12$83.00$17,596.00$110.00$23,320.00$81.55$17,288.60
2503.54115" RC PIPE SEWER DES 3006 CL VL F7,949$61.29$487,194.21$46.00$365,654.00$39.00$310,011.00$53.70$426,861.30
2503.54124" RC PIPE SEWER DES 3006 CL IIIL F651$70.79$46,084.29$57.00$37,107.00$58.00$37,758.00$68.50$44,593.50
2503.54118" RC PIPE SEWER DES 3006 CL IIIL F1,212$64.76$78,489.12$48.00$58,176.00$43.00$52,116.00$58.10$70,417.20
2503.54127" RC PIPE SEWER DES 3006 CL IIIL F77$80.49$6,197.73$68.00$5,236.00$100.00$7,700.00$77.00$5,929.00
2503.602CONNECT TO EXISTING STORM SEWEREACH39$1,918.84$74,834.76$650.00$25,350.00$800.00$31,200.00$1,879.10$73,284.90
2503.60315" PVC PIPE SEWERL F190$65.57$12,458.30$48.00$9,120.00$80.00$15,200.00$88.75$16,862.50
2503.60312" PVC PIPE SEWERL F72$58.89$4,240.08$43.00$3,096.00$75.00$5,400.00$81.85$5,893.20
2504.6026" PIPE PLUGEACH2$586.31$1,172.62$250.00$500.00$200.00$400.00$1,697.30$3,394.60
2504.60216"X6" TEE FITTINGEACH11$3,831.27$42,143.97$2,500.00$27,500.00$2,500.00$27,500.00$2,832.10$31,153.10
2504.60216" MEGALUGEACH114$320.87$36,579.18$265.00$30,210.00$320.00$36,480.00$471.40$53,739.60
2504.602ADJUST VALVE BOXEACH13$426.40$5,543.20$325.00$4,225.00$400.00$5,200.00$1,260.90$16,391.70
2504.6026" MEGALUGEACH44$174.82$7,692.08$55.00$2,420.00$125.00$5,500.00$318.50$14,014.00
2504.60216" SLEEVEEACH38$732.36$27,829.68$775.00$29,450.00$3,100.00$117,800.00$1,831.30$69,589.40
2504.60216" PIPE BEND 45 DEGREEEACH8$2,646.92$21,175.36$2,100.00$16,800.00$1,700.00$13,600.00$2,187.00$17,496.00
2504.602ADJUST CURB BOXEACH208$293.15$60,975.20$165.00$34,320.00$260.00$54,080.00$586.00$121,888.00
2504.6026" GATE VALVE & BOXEACH11$3,118.10$34,299.10$2,100.00$23,100.00$1,400.00$15,400.00$2,318.60$25,504.60
2504.602HYDRANTEACH11$5,170.19$56,872.09$3,400.00$37,400.00$5,600.00$61,600.00$5,664.10$62,305.10
2504.6036" WATERMAIN DUCTILE IRON CL 52L F116$48.23$5,594.68$85.00$9,860.00$160.00$18,560.00$79.15$9,181.40
2504.60316" WATERMAIN DUCTILE IRON CL 52L F212$86.88$18,418.56$225.00$47,700.00$220.00$46,640.00$119.40$25,312.80
2504.603RECONSTRUCT WATER MANHOLEL F9$567.12$5,104.08$500.00$4,500.00$1,100.00$9,900.00$657.50$5,917.50
2504.6042" POLYSTYRENE INSULATIONS Y60$21.05$1,263.00$35.00$2,100.00$30.00$1,800.00$52.05$3,123.00
2506.501CONST DRAINAGE STRUCTURE DES 78-4020L F12.6$602.30$7,588.98$800.00$10,080.00$810.00$10,206.00$1,075.00$13,545.00
2506.501CONST DRAINAGE STRUCTURE DES 120-4020L F6$1,639.54$9,837.24$1,700.00$10,200.00$1,800.00$10,800.00$2,762.60$16,575.60
2506.501CONST DRAINAGE STRUCTURE DES 66-4020L F35.8$454.65$16,276.47$520.00$18,616.00$560.00$20,048.00$615.30$22,027.74
2506.501CONST DRAINAGE STRUCTURE DESIGN FL F470.5$233.46$109,842.93$460.00$216,430.00$450.00$211,725.00$443.20$208,525.60
2506.501CONST DRAINAGE STRUCTURE DES 60-4020L F124.1$358.98$44,549.42$505.00$62,670.50$440.00$54,604.00$484.30$60,101.63
2506.501CONST DRAINAGE STRUCTURE DES 72-4020L F28.9$505.29$14,602.88$650.00$18,785.00$640.00$18,496.00$668.10$19,308.09
2506.501CONST DRAINAGE STRUCTURE DES 96-4020L F6.3$878.40$5,533.92$1,200.00$7,560.00$1,000.00$6,300.00$1,227.20$7,731.36
2506.501CONST DRAINAGE STRUCTURE DES 84-4020L F5.7$728.63$4,153.19$1,100.00$6,270.00$910.00$5,187.00$1,102.30$6,283.11
2506.501CONST DRAINAGE STRUCTURE DESIGN NL F449.8$157.77$70,964.95$475.00$213,655.00$360.00$161,928.00$320.60$144,205.88
2506.502CONST DRAINAGE STRUCTURE DESIGN SPECIALEACH1$666.26$666.26$18,500.00$18,500.00$10,000.00$10,000.00$9,431.00$9,431.00
2506.503RECONSTRUCT DRAINAGE STRUCTUREL F20.2$567.12$11,455.82$600.00$12,120.00$720.00$14,544.00$765.20$15,457.04
2506.516CASTING ASSEMBLYEACH262$666.26$174,560.12$800.00$209,600.00$990.00$259,380.00$1,772.70$464,447.40
2506.521INSTALL CASTINGEACH101$346.46$34,992.46$550.00$55,550.00$990.00$99,990.00$817.40$82,557.40
2506.522ADJUST FRAME & RING CASTINGEACH78$319.80$24,944.40$550.00$42,900.00$400.00$31,200.00$666.70$52,002.60
2506.602CONNECT INTO EXISTING DRAINAGE STRUCTUREEACH12$2,611.74$31,340.88$800.00$9,600.00$1,200.00$14,400.00$1,172.00$14,064.00
2506.603RECONSTRUCT SANITARY MANHOLESLIN FT400.2$567.12$226,961.42$700.00$280,140.00$870.00$348,174.00$855.40$342,331.08
2521.5016" CONCRETE WALKS F40,224$5.60$225,254.40$6.54$263,064.96$8.30$333,859.20$8.80$353,971.20
2521.5014" CONCRETE WALKS F40,629$4.58$186,080.82$4.54$184,455.66$5.20$211,270.80$5.80$235,648.20
2521.5114" BITUMINOUS WALKS F284$3.77$1,070.68$6.00$1,704.00$8.00$2,272.00$5.10$1,448.40
2521.6186" CONCRETE WALK SPECIAL 1SQ FT1,860$10.87$20,218.20$9.39$17,465.40$15.00$27,900.00$15.50$28,830.00
2521.6186" CONCRETE WALK SPECIALS F1,700$10.39$17,663.00$9.64$16,388.00$14.00$23,800.00$15.60$26,520.00
2521.6184" CONCRETE WALK SPECIALS F25,135$8.58$215,658.30$6.54$164,382.90$11.20$281,512.00$11.60$291,566.00
2531.501CONCRETE CURB & GUTTER DESIGN D424L F98$26.65$2,611.70$34.50$3,381.00$30.00$2,940.00$32.00$3,136.00
2531.501CONCRETE CURB & GUTTER DESIGN B624 (MOD)L F357$22.92$8,182.44$39.50$14,101.50$41.00$14,637.00$42.00$14,994.00
2531.501CONCRETE CURB & GUTTER DESIGN B660L F18$58.63$1,055.34$60.00$1,080.00$85.00$1,530.00$88.00$1,584.00
2531.501CONCRETE CURB & GUTTER DESIGN B612L F782$14.87$11,628.34$18.45$14,427.90$22.00$17,204.00$23.10$18,064.20
2531.501CONCRETE CURB & GUTTER DESIGN B624L F28,230$15.72$443,775.60$18.84$531,853.20$18.00$508,140.00$20.00$564,600.00
2531.5076" CONCRETE DRIVEWAY PAVEMENTS Y502$50.37$25,285.74$55.69$27,956.38$60.00$30,120.00$59.00$29,618.00
2531.5078" CONCRETE DRIVEWAY PAVEMENTS Y1,406$58.04$81,604.24$65.69$92,360.14$70.00$98,420.00$70.00$98,420.00
2531.603CONCRETE CURB DESIGN VL F935$19.72$18,438.20$20.00$18,700.00$20.00$18,700.00$21.00$19,635.00
2531.618TRUNCATED DOMESS F2,013$53.30$107,292.90$46.44$93,483.72$40.00$80,520.00$41.00$82,533.00
2533.507PORTABLE PRECAST CONCR BARRIER DES 8337L F500$24.52$12,260.00$16.60$8,300.00$16.00$8,000.00$16.00$8,000.00
2533.508RELOCATE PORT PRECAST CONC BAR DES 8337L F1,000$3.73$3,730.00$4.00$4,000.00$3.40$3,400.00$3.30$3,300.00
2540.602BOLLARDEACH18$334.20$6,015.60$600.00$10,800.00$635.00$11,430.00$551.50$9,927.00
2545.503ELECTRIC POWER SYSTEMLS1$25,824.30$25,824.30$24,225.00$24,225.00$15,000.00$15,000.00$15,000.00$15,000.00
2545.511LIGHTING UNIT TYPE SPECIAL 1EACH92$3,890.97$357,969.24$3,650.00$335,800.00$4,200.00$386,400.00$4,015.10$369,389.20
2545.511LIGHTING UNIT TYPE SPECIALEACH92$4,423.98$407,006.16$4,150.00$381,800.00$4,600.00$423,200.00$4,439.70$408,452.40
2545.515LIGHT FOUNDATION DESIGN SPECIAL 1EACH96$959.41$92,103.36$900.00$86,400.00$1,200.00$115,200.00$1,162.60$111,609.60
2545.515LIGHT FOUNDATION DESIGN SPECIALEACH96$692.91$66,519.36$650.00$62,400.00$840.00$80,640.00$805.20$77,299.20
2545.5232" NON-METALLIC CONDUITL F29,100$3.20$93,120.00$3.00$87,300.00$5.30$154,230.00$5.05$146,955.00
2545.531UNDERGROUND WIRE 1 COND NO 4L F99,480$1.44$143,251.20$1.35$134,298.00$1.30$129,324.00$1.20$119,376.00
2545.531UNDERGROUND WIRE 1 COND NO 12L F16,560$0.64$10,598.40$0.60$9,936.00$0.43$7,120.80$0.40$6,624.00
2545.531UNDERGROUND WIRE 1 COND NO 8L F33,160$0.85$28,186.00$0.80$26,528.00$0.73$24,206.80$0.70$23,212.00
2545.541SERVICE CABINETEACH1$5,061.99$5,061.99$4,748.50$4,748.50$5,300.00$5,300.00$5,131.40$5,131.40
2545.544SERVICE EQUIPMENTEACH1$5,063.59$5,063.59$4,750.00$4,750.00$710.00$710.00$681.70$681.70
2545.545EQUIPMENT PADEACH1$1,039.37$1,039.37$975.00$975.00$960.00$960.00$922.10$922.10
2545.553HANDHOLEEACH13$1,012.72$13,165.36$1,100.00$14,300.00$1,200.00$15,600.00$1,127.30$14,654.90
2545.602INSTALL SALVAGED LIGHTING UNITEACH8$399.76$3,198.08$375.00$3,000.00$700.00$5,600.00$675.10$5,400.80
2550.511SIGN FOUNDATIONEACH11$266.50$2,931.50$375.00$4,125.00$290.00$3,190.00$710.60$7,816.60
2550.601FIBER OPTIC SYSTEMLUMP SUM1$12,019.36$12,019.36$11,275.00$11,275.00$13,000.00$13,000.00$12,413.00$12,413.00
2557.603INSTALL FENCEL F31$53.30$1,652.30$25.00$775.00$80.00$2,480.00$55.15$1,709.65
2563.601DETOUR SIGNING STAGE 4LUMP SUM1$7,195.62$7,195.62$10,150.00$10,150.00$7,600.00$7,600.00$7,500.00$7,500.00
2563.601DETOUR SIGNING STAGE 1LUMP SUM1$6,662.61$6,662.61$10,150.00$10,150.00$7,000.00$7,000.00$7,000.00$7,000.00
2563.601DETOUR SIGNING STAGE 2LUMP SUM1$6,662.61$6,662.61$10,150.00$10,150.00$7,000.00$7,000.00$7,000.00$7,000.00
2563.601DETOUR SIGNING STAGE 3LUMP SUM1$7,195.62$7,195.62$10,150.00$10,150.00$7,600.00$7,600.00$7,500.00$7,500.00
2563.601TRAFFIC CONTROLLS1$77,233.03$77,233.03$50,000.00$50,000.00$105,000.00$105,000.00$180,000.00$180,000.00
2563.602RAISED PAVEMENT MARKER TEMPORARYEACH200$1.60$320.00$1.60$320.00$1.70$340.00$1.65$330.00
2563.613PORTABLE CHANGEABLE MESSAGE SIGNUDAY100$106.60$10,660.00$80.00$8,000.00$110.00$11,000.00$110.30$11,030.00
2563.618CONSTRUCTION SIGN-SPECIALS F100$15.99$1,599.00$19.00$1,900.00$17.00$1,700.00$16.55$1,655.00
2564.531SIGN PANELS TYPE CS F1,048$32.51$34,070.48$45.00$47,160.00$35.00$36,680.00$33.65$35,265.20
2564.537INSTALL SIGN TYPE CEACH119$106.60$12,685.40$107.00$12,733.00$120.00$14,280.00$110.30$13,125.70
2564.537INSTALL SIGN TYPE SPECIALEACH2$79.96$159.92$80.00$160.00$87.00$174.00$82.75$165.50
2564.602INSTALL SIGN COLLAREACH251$266.50$66,891.50$125.00$31,375.00$290.00$72,790.00$275.80$69,225.80
2565.511TRAFFIC CONTROL SIGNAL SYSTEM CSIGS1$120,993.09$120,993.09$159,000.00$159,000.00$160,000.00$160,000.00$149,275.00$149,275.00
2565.511TRAFFIC CONTROL SIGNAL SYSTEM FSIG SYS1$133,785.31$133,785.31$221,000.00$221,000.00$160,000.00$160,000.00$156,577.00$156,577.00
2565.511TRAFFIC CONTROL SIGNAL SYSTEM ESIG SYS1$125,257.17$125,257.17$213,000.00$213,000.00$150,000.00$150,000.00$144,918.00$144,918.00
2565.511TRAFFIC CONTROL SIGNAL SYSTEM ASIGS1$145,511.51$145,511.51$182,000.00$182,000.00$170,000.00$170,000.00$159,665.00$159,665.00
2565.511TRAFFIC CONTROL SIGNAL SYSTEM GSIG SYS1$60,763.05$60,763.05$152,500.00$152,500.00$78,000.00$78,000.00$74,731.00$74,731.00
2565.511TRAFFIC CONTROL SIGNAL SYSTEM BSIGS1$125,257.17$125,257.17$163,000.00$163,000.00$150,000.00$150,000.00$144,322.00$144,322.00
2565.511TRAFFIC CONTROL SIGNAL SYSTEM DSIG SYS1$137,516.38$137,516.38$174,500.00$174,500.00$160,000.00$160,000.00$157,404.00$157,404.00
2565.601EMERGENCY VEHICLE PREEMPTION SYS FLUMP SUM1$5,330.09$5,330.09$5,000.00$5,000.00$4,600.00$4,600.00$4,412.20$4,412.20
2565.601EMERGENCY VEHICLE PREEMPTION SYS CLS1$5,330.09$5,330.09$5,000.00$5,000.00$4,600.00$4,600.00$4,412.20$4,412.20
2565.601EMERGENCY VEHICLE PREEMPTION SYS ELUMP SUM1$5,330.09$5,330.09$5,000.00$5,000.00$4,600.00$4,600.00$4,412.20$4,412.20
2565.601EMERGENCY VEHICLE PREEMPTION SYS BLS1$5,330.09$5,330.09$5,000.00$5,000.00$4,600.00$4,600.00$4,412.20$4,412.20
2565.601EMERGENCY VEHICLE PREEMPTION SYS ALS1$5,330.09$5,330.09$5,000.00$5,000.00$4,600.00$4,600.00$4,412.20$4,412.20
2565.601EMERGENCY VEHICLE PREEMPTION SYS GLUMP SUM1$5,330.09$5,330.09$5,000.00$5,000.00$4,600.00$4,600.00$4,412.20$4,412.20
2565.601EMERGENCY VEHICLE PREEMPTION SYS DLUMP SUM1$5,330.09$5,330.09$5,000.00$5,000.00$4,600.00$4,600.00$4,412.20$4,412.20
2565.602HANDHOLE DESIGN MPLSEACH38$959.41$36,457.58$1,100.00$41,800.00$1,500.00$57,000.00$1,400.90$53,234.20
2565.6031/C#14 INTERCONNECTL F13,055$0.53$6,919.15$0.50$6,527.50$0.52$6,788.60$0.50$6,527.50
2565.6033" NON-METTALLIC CONDUIT TRENCHEDLIN FT12,840$7.46$95,786.40$7.00$89,880.00$7.70$98,868.00$7.35$94,374.00
2565.60312/PR #19L F1,165$4.26$4,962.90$4.00$4,660.00$7.10$8,271.50$6.85$7,980.25
2565.6031/C#8LIN FT965$0.85$820.25$0.80$772.00$2.20$2,123.00$2.10$2,026.50
2565.603FIBER OPTIC CABLE 24SMLIN FT13,055$2.13$27,807.15$2.00$26,110.00$2.30$30,026.50$2.25$29,373.75
2571.602TREE PROTECTIONEACH53$90.61$4,802.33$90.00$4,770.00$140.00$7,420.00$684.20$36,262.60
2571.602TREE GRATE & FRAMESEACH6$2,059.55$12,357.30$2,800.00$16,800.00$2,500.00$15,000.00$1,937.30$11,623.80
2572.501TEMPORARY FENCEL F10,000$1.65$16,500.00$1.66$16,600.00$1.75$17,500.00$1.70$17,000.00
2572.502CLEAN ROOT CUTTINGL F10,000$3.20$32,000.00$0.50$5,000.00$5.00$50,000.00$9.70$97,000.00
2572.503WATERGAL200,000$0.05$10,000.00$0.06$12,000.00$0.07$14,000.00$0.15$30,000.00
2573.530STORM DRAIN INLET PROTECTIONEACH182$213.05$38,775.10$225.00$40,950.00$140.00$25,480.00$461.00$83,902.00
2573.550EROSION CONTROL SUPERVISORLS1$36,208.60$36,208.60$3,500.00$3,500.00$24,000.00$24,000.00$40,000.00$40,000.00
2573.602TEMPORARY ROCK CONSTRUCTION ENTRANCEEACH46$1,166.72$53,669.12$750.00$34,500.00$2,300.00$105,800.00$1,472.40$67,730.40
2574.508FERTILIZER TYPE 3LB969$0.72$697.68$0.73$707.37$1.00$969.00$0.75$726.75
2574.525BOULEVARD TOPSOIL BORROWCU YD4,184$35.71$149,410.64$35.00$146,440.00$35.00$146,440.00$54.80$229,283.20
2575.505SPOT HYDROSEEDSQ YD1,755$3.14$5,510.70$3.15$5,528.25$3.50$6,142.50$3.25$5,703.75
2575.505SODDING TYPE LAWNS Y1,189$4.21$5,005.69$4.25$5,053.25$4.50$5,350.50$4.35$5,172.15
2575.505SODDING TYPE SALT TOLERANTS Y22,061$4.74$104,569.14$4.75$104,789.75$5.00$110,305.00$4.90$108,098.90
2575.571RAPID STABILIZATION METHOD 3MGAL28$346.46$9,700.88$347.00$9,716.00$370.00$10,360.00$358.50$10,038.00
2581.501REMOVABLE PREFORM PAVEMENT MARKING TAPEL F1,200$1.44$1,728.00$1.25$1,500.00$1.50$1,800.00$1.50$1,800.00
2582.5026" SOLID LINE WHITE THERMOPLASTIC (GR IN)LIN FT5,151$7.89$40,641.39$7.92$40,795.92$8.40$43,268.40$8.15$41,980.65
2582.50224" SOLID LINE YELLOW-EPOXY-GR INL F145$9.59$1,390.55$9.63$1,396.35$10.20$1,479.00$9.95$1,442.75
2582.5024" BROKEN LINE YELLOW-EPOXY-GR INL F1,580$0.78$1,232.40$0.78$1,232.40$0.82$1,295.60$0.80$1,264.00
2582.5026" DOTTED LINE WHITE EPOXY (GR IN)LIN FT1,060$4.80$5,088.00$4.82$5,109.20$5.10$5,406.00$4.95$5,247.00
2582.5026" SOLID LINE WHITE-EPOXY-GR INL F15,325$1.28$19,616.00$1.28$19,616.00$1.40$21,455.00$1.30$19,922.50
2582.5024" SOLID LINE YELLOW-PAINTL F500$0.27$135.00$0.47$235.00$0.28$140.00$0.50$250.00
2582.5024" SOLID LINE WHITE-EPOXY-GR INL F32,105$0.77$24,720.85$0.77$24,720.85$0.81$26,005.05$0.80$25,684.00
2582.5024" DBLE SOLID LINE YELLOW-EPOXY- GR INL F5,170$1.56$8,065.20$1.56$8,065.20$1.60$8,272.00$1.60$8,272.00
2582.5026" DOTTED LINE WHITE THERMOPLASTIC (GR IN)LIN FT728$8.95$6,515.60$9.00$6,552.00$9.50$6,916.00$9.25$6,734.00
2582.502 4" DOTTED LINE WHITE - EPOXY (GR IN)LIN FT815$3.20$2,608.00$3.21$2,616.15$3.40$2,771.00$3.30$2,689.50
2582.50224" SOLID LINE WHITE-PAINTL F100$2.13$213.00$3.21$321.00$2.30$230.00$3.30$330.00
2582.5024" SOLID LINE YELLOW-EPOXY-GR INL F235$0.78$183.30$0.78$183.30$0.82$192.70$0.80$188.00
2582.5024" BROKEN LINE WHITE-EPOXY-GR INL F350$2.13$745.50$2.14$749.00$2.30$805.00$2.20$770.00
2582.502 4" DOUBLE SOLID LINE YELLOW THERMOPLASTIC (GR IN)LIN FT1,145$12.79$14,644.55$12.84$14,701.80$14.00$16,030.00$13.25$15,171.25
2582.5024" DOUBLE SOLID LINE YELLOW-PAINTL F2,000$0.43$860.00$1.00$2,000.00$0.46$920.00$0.95$1,900.00
2582.5024" SOLID LINE WHITE-PAINTL F6,000$0.27$1,620.00$0.46$2,760.00$0.28$1,680.00$0.45$2,700.00
2582.50212" SOLID LINE WHITE THERMOPLASTIC (GR IN)LIN FT2,976$14.92$44,401.92$15.00$44,640.00$16.00$47,616.00$15.45$45,979.20
2582.602PAVT MSSG (RT ARROW) THERMOPLASTIC (GR IN)EACH3$511.69$1,535.07$513.00$1,539.00$540.00$1,620.00$529.50$1,588.50
2582.602PAVT MSSG (BIKE) THERMOPLASTIC (GR IN)EACH49$533.01$26,117.49$535.00$26,215.00$560.00$27,440.00$551.50$27,023.50
2582.602PAVT MSSG (LT ARROW) THERMOPLASTIC (GR IN)EACH13$511.69$6,651.97$513.00$6,669.00$540.00$7,020.00$529.50$6,883.50
2582.6034" DOTTED LINE WHITE THERMOPLASTIC (GR IN)LIN FT460$8.10$3,726.00$8.13$3,739.80$8.60$3,956.00$8.40$3,864.00
2582.60324" STOP LINE WHITE THERMOPLASTIC (GR IN)LIN FT735$24.52$18,022.20$24.60$18,081.00$30.00$22,050.00$25.35$18,632.25
2582.618PAVT MSSG (SPECIAL 2) THERMOPLASTIC (GR IN)SQ FT845$20.25$17,111.25$20.33$17,178.85$21.00$17,745.00$20.95$17,702.75
2582.618PAVT MSSG (SPECIAL 1) THERMOPLASTIC (GR IN)SQ FT2,385$20.25$48,296.25$20.33$48,487.05$21.00$50,085.00$20.95$49,965.75
 Totals for project 2974200 $15,479,836.92 $15,521,554.55 $17,030,059.85 $20,025,341.08
 
Contract Total:$15,479,836.92$15,521,554.55$17,030,059.85$20,025,341.08