Hennepin County

Welcome, Guest!
Log in | Employee Login | License
 

Bid Abstract

2984200 - Grading, Surfacing, Drainage, Signal, etc. - 56th Street S to W Minnehaha Pkwy, in Minneapolis - 0 .45 mi.Thomas & Sons Construction, INC. Max Steininger Inc 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$104,000.00$104,000.00$205,000.00$205,000.00
2031.501FIELD OFFICE TYPE DEACH1$20,000.00$20,000.00$7,552.36$7,552.36
2031.503FIELD LABORATORY TYPE DEACH1$7,500.00$7,500.00$5,235.94$5,235.94
2101.502CLEARING AND GRUBBINGTREE12$500.00$6,000.00$320.24$3,842.88
2101.603ROOT CUTTINGLIN FT500$5.00$2,500.00$4.27$2,135.00
2102.501PAVEMENT MARKING REMOVALSQ FT150$1.65$247.50$1.60$240.00
2102.502PAVEMENT MARKING REMOVALLIN FT2,000$0.55$1,100.00$0.53$1,060.00
2103.507DISCONNECT WATER SERVICEEACH2$1,200.00$2,400.00$1,111.77$2,223.54
2104.501REMOVE PIPE SEWERSLIN FT1,599$7.50$11,992.50$11.12$17,780.88
2104.501REMOVE CURB AND GUTTERLIN FT255$3.50$892.50$3.77$961.35
2104.501REMOVE CONDUITLIN FT3,500$1.50$5,250.00$7.96$27,860.00
2104.501REMOVE MODULAR BLOCK RETAINING WALLLIN FT9$30.00$270.00$36.85$331.65
2104.503REMOVE BITUMINOUS PAVEMENTSQ FT441$1.00$441.00$1.59$701.19
2104.503REMOVE CONCRETE WALKSQ FT40,766$0.60$24,459.60$0.72$29,351.52
2104.505REMOVE CONCRETE DRIVEWAY PAVEMENTSQ YD792$7.50$5,940.00$6.32$5,005.44
2104.505REMOVE CONCRETE MEDIANSQ YD411$9.00$3,699.00$5.15$2,116.65
2104.505REMOVE PAVEMENT (P)SQ YD19,690$7.75$152,597.50$9.86$194,143.40
2104.509REMOVE LIGHT BASE FOUNDATIONEACH33$275.00$9,075.00$248.92$8,214.36
2104.509REMOVE DRAINAGE STRUCTUREEACH44$300.00$13,200.00$333.53$14,675.32
2104.513SAWING BIT PAVEMENT (FULL DEPTH)LIN FT1,026$5.50$5,643.00$1.65$1,692.90
2104.523SALVAGE LIGHTING UNITEACH33$185.00$6,105.00$194.54$6,419.82
2104.601SALVAGE SIGNAL SYSTEM CLUMP SUM1$4,860.00$4,860.00$5,169.35$5,169.35
2104.601REMOVE TRAFFIC SIGNAL INTERCONNECT CONDUITLUMP SUM1$5,225.00$5,225.00$5,937.53$5,937.53
2104.601SALVAGE SIGNAL SYSTEM BLUMP SUM1$4,860.00$4,860.00$5,169.35$5,169.35
2104.601SALVAGE SIGNAL SYSTEM ALUMP SUM1$4,860.00$4,860.00$5,169.35$5,169.35
2104.602REMOVE MISCELLANEOUS STRUCTURESEACH1$500.00$500.00$533.73$533.73
2104.602SALVAGE & REINSTALL BUS SHELTEREACH4$1,750.00$7,000.00$4,245.95$16,983.80
2105.501COMMON EXCAVATIONCU YD427$30.00$12,810.00$11.60$4,953.20
2105.507SUBGRADE EXCAVATIONCU YD2,928$10.00$29,280.00$11.60$33,964.80
2105.522SELECT GRANULAR BORROW (CV)CU YD1,896$17.00$32,232.00$14.74$27,947.04
2105.602CONSTRUCT TEMPORARY BYPASSEACH1$31,500.00$31,500.00$26,140.98$26,140.98
2105.607EXCAVATION SPECIALCU YD750$14.00$10,500.00$36.39$27,292.50
2105.609HAUL & DISPOSE OF CONTAMINATED MATERIALTON3,000$23.00$69,000.00$25.49$76,470.00
2123.610SIDEWALK SWEEPER (WITH PICKUP BROOM)HOUR60$100.00$6,000.00$125.49$7,529.40
2123.610STREET SWEEPER (WITH PICKUP BROOM)HOUR60$125.00$7,500.00$125.49$7,529.40
2130.501WATERM GALLONS107$50.00$5,350.00$38.33$4,101.31
2131.502CALCIUM CHLORIDE SOLUTIONGALLON3,500$1.50$5,250.00$1.52$5,320.00
2211.503AGGREGATE BASE (CV) CLASS 5 (P)CU YD4,883$26.00$126,958.00$25.20$123,051.60
2301.602NO 13 REINF TIE BAR (EPOXY COATED)EACH75$10.00$750.00$5.56$417.00
2357.502BITUMINOUS MATERIAL FOR TACK COATGALLON762$3.15$2,400.30$3.24$2,468.88
2360.501TYPE SP 12.5 WEARING COURSE MIXTURE (3,C)TON3,352$68.75$230,450.00$71.10$238,327.20
2360.502TYPE SP 12.5 NON WEAR COURSE MIX (3,C)TON2,514$69.50$174,723.00$71.86$180,656.04
2502.5214" TP PIPE DRAINLIN FT43$20.00$860.00$23.35$1,004.05
2502.5414" PERF PE PIPE DRAINLIN FT1,008$11.00$11,088.00$11.74$11,833.92
2503.54127" RC PIPE SEWER DES 3006 CL VLIN FT280$88.00$24,640.00$83.38$23,346.40
2503.54124" RC PIPE SEWER DES 3006 CL VLIN FT7$80.00$560.00$65.59$459.13
2503.54133" RC PIPE SEWER DES 3006 CL IIILIN FT16$110.00$1,760.00$80.05$1,280.80
2503.54118" RC PIPE SEWER DES 3006 CL VLIN FT454$38.00$17,252.00$51.14$23,217.56
2503.54115" RC PIPE SEWER DES 3006 CL VLIN FT1,832$35.00$64,120.00$46.69$85,536.08
2503.54121" RC PIPE SEWER DES 3006 CL VLIN FT22$80.00$1,760.00$56.70$1,247.40
2503.54112" RC PIPE SEWER DES 3006 CL VLIN FT132$32.00$4,224.00$45.58$6,016.56
2503.54130" RC PIPE SEWER DES 3006 CL IIILIN FT16$95.00$1,520.00$73.38$1,174.08
2503.602DISCONNECT SANITARY SEWER SERVICEEACH2$500.00$1,000.00$555.88$1,111.76
2503.602RECONNECT TO EXISTING SANITARY SEWER SEREACH2$1,000.00$2,000.00$1,695.44$3,390.88
2503.602CONNECT INTO EXISTING DRAINAGE STRUCTUREEACH26$450.00$11,700.00$667.06$17,343.56
2504.602ADJUST CURB STOP BOXEACH18$125.00$2,250.00$183.44$3,301.92
2504.602RELOCATE HYDRANTEACH4$3,000.00$12,000.00$3,446.47$13,785.88
2504.602RECONNECT WATER SERVICEEACH2$1,200.00$2,400.00$945.00$1,890.00
2504.603INSPECTION HOLELIN FT100$50.00$5,000.00$122.29$12,229.00
2504.603TRENCH EXCAVATIONLIN FT769$7.00$5,383.00$44.47$34,197.43
2504.603RECONSTRUCT WATER MANHOLELIN FT66$450.00$29,700.00$411.35$27,149.10
2506.501CONST DRAINAGE STRUCTURE DES 60-4020LIN FT13.5$360.00$4,860.00$486.95$6,573.83
2506.501CONST DRAINAGE STRUCTURE DES 84-4020LIN FT8.8$600.00$5,280.00$833.83$7,337.70
2506.501CONST DRAINAGE STRUCTURE DESIGN GLIN FT106.7$285.00$30,409.50$355.76$37,959.59
2506.501CONST DRAINAGE STRUCTURE DES 96-4020LIN FT7.2$900.00$6,480.00$1,089.53$7,844.62
2506.501CONST DRAINAGE STRUCTURE DES 54-4020LIN FT14.3$325.00$4,647.50$478.05$6,836.12
2506.501CONST DRAINAGE STRUCTURE DESIGN FLIN FT219.6$285.00$62,586.00$339.09$74,464.16
2506.501CONST DRAINAGE STRUCTURE DESIGN NLIN FT9.3$250.00$2,325.00$355.76$3,308.57
2506.503RECONSTRUCT DRAINAGE STRUCTURELIN FT6$450.00$2,700.00$378.00$2,268.00
2506.516CASTING ASSEMBLY (SANITARY SEWER)EACH27$550.00$14,850.00$874.96$23,623.92
2506.516CASTING ASSEMBLYEACH22$680.00$14,960.00$874.96$19,249.12
2506.516CASTING ASSEMBLY (STORM SEWER)EACH20$550.00$11,000.00$874.96$17,499.20
2506.522ADJUST FRAME & RING CASTINGEACH5$500.00$2,500.00$644.82$3,224.10
2506.603RECONSTRUCT SANITARY MANHOLESLIN FT81$475.00$38,475.00$411.35$33,319.35
2521.5014" CONCRETE WALKSQ FT47,623$3.04$144,773.92$3.39$161,441.97
2521.5013.5" CONCRETE WALKSQ FT3,474$2.73$9,484.02$3.28$11,394.72
2521.5016" CONCRETE WALKSQ FT6,053$4.93$29,841.29$5.24$31,717.72
2521.515SAWING CONCRETE WALKLIN FT170$3.00$510.00$3.15$535.50
2521.603SAWING CONCRETE WALKLIN FT2,375$2.50$5,937.50$3.15$7,481.25
2531.501CONCRETE CURB & GUTTER DESIGN B624LIN FT4,664$14.88$69,400.32$12.93$60,305.52
2531.501CONCRETE CURB & GUTTER DESIGN B624 (MOD)LIN FT224$19.88$4,453.12$13.24$2,965.76
2531.501CONCRETE CURB & GUTTER DESIGN SPECIALLIN FT11$29.00$319.00$31.78$349.58
2531.501CONCRETE CURB & GUTTER DESIGN B612LIN FT2,925$10.48$30,654.00$8.95$26,178.75
2531.502CONCRETE CURB DESIGN V6LIN FT121$25.00$3,025.00$21.72$2,628.12
2531.5078" CONCRETE DRIVEWAY PAVEMENTSQ YD1,102$51.85$57,138.70$54.30$59,838.60
2531.602CONC ENTRANCE NOSE DES 7113EACH9$348.00$3,132.00$450.27$4,052.43
2531.618TRUNCATED DOMESSQ FT629$41.45$26,072.05$39.73$24,990.17
2533.507PORTABLE PRECAST CONC BARRIER DES 8337LIN FT500$15.00$7,500.00$14.41$7,205.00
2533.508RELOCATE PORT PRECAST CONC BAR DES 8337LIN FT500$4.00$2,000.00$3.74$1,870.00
2545.511LIGHTING UNIT TYPE SPECIAL 2EACH20$4,025.00$80,500.00$4,252.20$85,044.00
2545.511LIGHTING UNIT TYPE SPECIAL 1EACH24$4,050.00$97,200.00$4,279.99$102,719.76
2545.515LIGHT BASE DESIGN SPECIAL 2EACH20$785.00$15,700.00$833.77$16,675.40
2545.515LIGHT BASE DESIGN SPECIAL 1EACH24$605.00$14,520.00$644.77$15,474.48
2545.5230.75" NON-METALLIC CONDUITLIN FT50$3.90$195.00$4.17$208.50
2545.5232" NON-METALLIC CONDUITLIN FT4,760$3.15$14,994.00$3.34$15,898.40
2545.5233" NON-METALLIC CONDUITLIN FT140$6.10$854.00$6.50$910.00
2545.531UNDERGROUND WIRE 1 COND NO 12LIN FT4,300$0.65$2,795.00$0.67$2,881.00
2545.531UNDERGROUND WIRE 1 COND NO 8LIN FT5,520$0.95$5,244.00$1.00$5,520.00
2545.531UNDERGROUND WIRE 1 COND NO 4LIN FT16,560$1.50$24,840.00$1.61$26,661.60
2545.601TEMPORARY LIGHTING SYSTEMLUMP SUM1$5,225.00$5,225.00$5,558.43$5,558.43
2545.602PULL BOX DESIGN MINNEAPOLISEACH2$720.00$1,440.00$767.07$1,534.14
2545.6032" NON-METALLIC CONDUIT TRENCHEDLIN FT811$3.55$2,879.05$3.78$3,065.58
2554.602IMPACT ATTENUATOR BARRELSEACH10$220.00$2,200.00$213.49$2,134.90
2554.615RELOCATE IMPACT ATTENUATORASSEMBLY2$275.00$550.00$266.87$533.74
2554.615IMPACT ATTENUATORASSEMBLY2$1,100.00$2,200.00$1,067.47$2,134.94
2563.601TRAFFIC CONTROL AREA 5LUMP SUM1$9,900.00$9,900.00$9,607.23$9,607.23
2563.601TRAFFIC CONTROL AREA 1LUMP SUM1$10,000.00$10,000.00$9,607.23$9,607.23
2563.601TRAFFIC CONTROL AREA 3LUMP SUM1$10,000.00$10,000.00$9,607.23$9,607.23
2563.601TRAFFIC CONTROL AREA 4LUMP SUM1$10,000.00$10,000.00$9,607.23$9,607.23
2563.601TRAFFIC CONTROL AREA 6LUMP SUM1$9,900.00$9,900.00$9,607.23$9,607.23
2563.601TRAFFIC CONTROL AREA 2LUMP SUM1$10,000.00$10,000.00$9,607.23$9,607.23
2563.602RAISED PAVEMENT MARKER TEMPORARYEACH200$1.65$330.00$1.60$320.00
2563.602PORTABLE CONCRETE BARRIER DELINEATOREACH30$5.00$150.00$4.80$144.00
2563.613REFLECTORIZED PLASTIC SAFETY DRUMUNIT DAY300$0.80$240.00$0.75$225.00
2563.613FLASHER TYPE B (HIGH INTENSITY)UNIT DAY600$0.55$330.00$0.53$318.00
2563.6134'X4' SIGN WITH SUPPORTSUNIT DAY300$2.20$660.00$2.13$639.00
2563.613PORTABLE CHANGEABLE MESSAGE SIGNUNIT DAY150$11.00$1,650.00$10.67$1,600.50
2563.613TYPE III BARRICADESUNIT DAY300$2.20$660.00$2.13$639.00
2563.618CONSTRUCTION SIGN-SPECIALSQ FT500$16.50$8,250.00$16.01$8,005.00
2564.602INSTALL SIGN COLLAREACH99$55.00$5,445.00$68.86$6,817.14
2565.522SEMI T ACT T CONTROL SIGNAL SYSTEM BSIG SYS1$107,000.00$107,000.00$113,857.89$113,857.89
2565.522SEMI T ACT T CONTROL SIGNAL SYSTEM ASIG SYS1$109,250.00$109,250.00$111,113.13$111,113.13
2565.522SEMI T ACT T CONTROL SIGNAL SYSTEM CSIG SYS1$79,700.00$79,700.00$84,766.15$84,766.15
2565.602HANDHOLE DESIGN MPLSEACH17$760.00$12,920.00$805.98$13,701.66
2565.60312PR #19 INTERCONNECT FILLEDLIN FT5,171$4.20$21,718.20$4.45$23,010.95
2565.6033" NON-METTALLIC CONDUIT TRENCHEDLIN FT2,610$5.25$13,702.50$5.56$14,511.60
2571.602TREE PROTECTIONEACH29$150.00$4,350.00$133.43$3,869.47
2572.501TEMPORARY FENCELIN FT1,000$1.75$1,750.00$1.60$1,600.00
2573.530STORM DRAIN INLET PROTECTIONEACH49$250.00$12,250.00$199.84$9,792.16
2573.540FILTER LOG TYPE STRAW BIOROLLLIN FT496$5.00$2,480.00$4.54$2,251.84
2573.550EROSION CONTROL SUPERVISORLUMP SUM1$3,000.00$3,000.00$1.07$1.07
2573.602TEMPORARY ROCK CONSTRUCTION ENTRANCEEACH4$1,200.00$4,800.00$1,160.26$4,641.04
2575.505SODDING TYPE SALT RESISTANTSQ YD2,370$3.50$8,295.00$3.31$7,844.70
2575.560HYDRAULIC SOIL STABILIZER TYPE 6POUND750$1.25$937.50$1.06$795.00
2575.607SELECT TOPSOIL BORROW (CV)CU YD1,164$16.00$18,624.00$30.87$35,932.68
2581.501REMOVABLE PREFORMED PLASTIC MARKINGLIN FT1,000$1.45$1,450.00$1.33$1,330.00
2582.501PAVT MSSG (RT ARROW) PAINTEACH1$50.00$50.00$42.70$42.70
2582.501PAVT MESSAGE (LT ARROW) THERMOPLASTIC GR INEACH13$335.00$4,355.00$325.58$4,232.54
2582.501PAVT MESSAGE (RT ARROW) THERMOPLASTIC GR INEACH9$335.00$3,015.00$325.58$2,930.22
2582.501PAVT MSSG (LT ARROW) PAINTEACH16$45.00$720.00$42.70$683.20
2582.5024" DB SOLID LINE YELLOW-POLY PREF(GR IN)LIN FT295$8.25$2,433.75$8.01$2,362.95
2582.5024" SOLID LINE WHITE-POLY PREF (GR IN)LIN FT4,870$3.85$18,749.50$3.74$18,213.80
2582.5026" SOLID LINE WHITE-POLY PREF (GR IN)LIN FT1,260$5.80$7,308.00$5.60$7,056.00
2582.50212" SOLID LINE WHITE-POLY PREF (GR IN)LIN FT295$12.00$3,540.00$11.21$3,306.95
2582.5024" SOLID LINE YELLOW-PAINTLIN FT7,120$0.22$1,566.40$0.21$1,495.20
2582.5024" SOLID LINE WHITE-PAINTLIN FT5,685$0.22$1,250.70$0.21$1,193.85
2582.5024" BROKEN LINE YELLOW-POLY PREF (GR IN)LIN FT100$5.50$550.00$5.34$534.00
2582.5024" DOUBLE SOLID LINE YELLOW-PAINTLIN FT7,160$0.45$3,222.00$0.43$3,078.80
2582.5024" SOLID LINE YELLOW-POLY PREF (GR IN)LIN FT870$3.85$3,349.50$3.74$3,253.80
 Totals for project 2984200 $2,751,039.92 $3,098,364.78
 