2013002 - Off road trail - TH 55 to Baker Park Reserve, in Medina Approx. 3 miles (Phase II - Maple Park in Medina to CSAH 11)Veit & Company, Inc. Doboszenski and Sons Knife River Corporation - North Central Thomas & Sons Construction, INC. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$10,010.00$10,010.00$99,562.00$99,562.00$42,808.82$42,808.82$65,000.00$65,000.00
2031.501FIELD OFFICE TYPE DEACH1$4,500.00$4,500.00$10,164.75$10,164.75$2,693.69$2,693.69$30,000.00$30,000.00
2101.511CLEARING AND GRUBBINGLUMP SUM1$8,950.00$8,950.00$9,438.49$9,438.49$9,144.53$9,144.53$9,350.00$9,350.00
2101.603ROOT CUTTINGLIN FT1,000$1.00$1,000.00$6.38$6,380.00$3.60$3,600.00$6.30$6,300.00
2102.501PAVEMENT MARKING REMOVALSQ FT200$1.10$220.00$1.59$318.00$1.54$308.00$1.65$330.00
2102.502PAVEMENT MARKING REMOVALLIN FT4,000$0.55$2,200.00$0.53$2,120.00$0.51$2,040.00$0.50$2,000.00
2104.501REMOVE SEWER PIPE (STORM)LIN FT11$9.00$99.00$29.44$323.84$20.60$226.60$10.00$110.00
2104.501REMOVE PIPE CULVERTSLIN FT298$7.00$2,086.00$10.33$3,078.34$7.72$2,300.56$9.00$2,682.00
2104.501REMOVE FENCELIN FT1,000$2.00$2,000.00$1.60$1,600.00$3.09$3,090.00$5.00$5,000.00
2104.501REMOVE CURB AND GUTTERLIN FT1,411$1.55$2,187.05$1.25$1,763.75$3.09$4,359.99$2.50$3,527.50
2104.501REMOVE HANDRAILLIN FT8$16.50$132.00$12.25$98.00$10.30$82.40$10.00$80.00
2104.501REMOVE WATER MAINLIN FT97$9.00$873.00$12.45$1,207.65$20.60$1,998.20$6.00$582.00
2104.501REMOVE RETAINING WALLLIN FT108$13.30$1,436.40$3.20$345.60$15.45$1,668.60$6.00$648.00
2104.505REMOVE CONCRETE WALKSQ YD882$2.50$2,205.00$1.15$1,014.30$6.02$5,309.64$4.50$3,969.00
2104.505REMOVE BITUMINOUS PAVEMENT (P)SQ YD4,702$1.45$6,817.90$2.00$9,404.00$4.91$23,086.82$6.00$28,212.00
2104.505REMOVE CONCRETE DRIVEWAY PAVEMENTSQ YD82$2.50$205.00$2.70$221.40$9.27$760.14$6.50$533.00
2104.507REMOVE STONE FILLCU YD4$11.00$44.00$67.00$268.00$25.75$103.00$15.00$60.00
2104.507REMOVE RIPRAPCU YD14$3.25$45.50$9.65$135.10$25.75$360.50$15.00$210.00
2104.509REMOVE CASTINGEACH1$11.00$11.00$55.00$55.00$77.23$77.23$50.00$50.00
2104.509REMOVE PIPE APRONEACH12$143.00$1,716.00$150.00$1,800.00$154.47$1,853.64$100.00$1,200.00
2104.509REMOVE MANHOLE OR CATCH BASINEACH6$300.00$1,800.00$250.00$1,500.00$411.92$2,471.52$250.00$1,500.00
2104.509REMOVE HYDRANTEACH4$562.00$2,248.00$410.00$1,640.00$1,029.79$4,119.16$250.00$1,000.00
2104.509REMOVE STAIRSEACH1$225.00$225.00$410.00$410.00$514.89$514.89$800.00$800.00
2104.509REMOVE GATE VALVEEACH1$56.00$56.00$880.00$880.00$772.34$772.34$150.00$150.00
2104.511SAWING CONCRETE PAVEMENT (FULL DEPTH)LIN FT44$3.35$147.40$2.13$93.72$8.24$362.56$5.00$220.00
2104.513SAWING BIT PAVEMENT (FULL DEPTH)LIN FT6,927$1.85$12,814.95$2.87$19,880.49$1.99$13,784.73$2.25$15,585.75
2104.523SALVAGE SIGN TYPE SPECIALEACH7$40.00$280.00$26.57$185.99$25.74$180.18$20.00$140.00
2104.523SALVAGE SIGN PANEL TYPE CEACH67$40.00$2,680.00$26.57$1,780.19$25.74$1,724.58$165.00$11,055.00
2104.525ABANDON GATE VALVEEACH4$140.00$560.00$600.00$2,400.00$772.34$3,089.36$150.00$600.00
2104.602RELOCATE FLAGPOLEEACH1$750.00$750.00$1,200.00$1,200.00$2,574.47$2,574.47$1,500.00$1,500.00
2104.603SALVAGE LANDSCAPE EDGINGLIN FT41$2.50$102.50$1.20$49.20$5.39$220.99$0.10$4.10
2105.501COMMON EXCAVATIONCU YD12,421$5.00$62,105.00$11.25$139,736.25$8.75$108,683.75$7.40$91,915.40
2105.507SUBGRADE EXCAVATION (P)CU YD2,986$4.25$12,690.50$2.20$6,569.20$9.78$29,203.08$7.40$22,096.40
2105.523COMMON BORROW (LV)CU YD25,420$7.40$188,108.00$4.27$108,543.40$10.81$274,790.20$14.55$369,861.00
2105.526SELECT TOPSOIL BORROW (CV)CU YD4$22.00$88.00$16.50$66.00$25.75$103.00$85.00$340.00
2105.543STABILIZING AGGREGATETON200$29.50$5,900.00$12.50$2,500.00$36.04$7,208.00$14.00$2,800.00
2105.603FILTRATION DITCHLIN FT2,244$22.15$49,704.60$23.00$51,612.00$36.04$80,873.76$58.00$130,152.00
2105.604GEOTEXTILE FABRIC TYPE VSQ YD2,844$1.10$3,128.40$1.25$3,555.00$1.70$4,834.80$2.00$5,688.00
2105.607TOPSOIL BORROW SPECIAL 1 (CV)CU YD165$0.00$0.00$45.00$7,425.00$36.04$5,946.60$80.00$13,200.00
2105.607HAUL & DISPOSE CONCRETE & BIT RUBBLE (LV)CU YD30$0.00$0.00$2.87$86.10$80.81$2,424.30$35.00$1,050.00
2105.607HAUL & DISPOSE OF CONTAMINATED MATERIALCU YD200$20.00$4,000.00$26.00$5,200.00$25.74$5,148.00$40.00$8,000.00
2105.607EXCAVATION SPECIALCU YD200$10.88$2,176.00$8.10$1,620.00$15.45$3,090.00$12.50$2,500.00
2118.501AGGREGATE SURFACING CLASS 2TON34$13.50$459.00$19.60$666.40$30.32$1,030.88$65.00$2,210.00
2123.610STREET SWEEPER (WITH PICKUP BROOM)HOUR200$115.00$23,000.00$135.00$27,000.00$102.98$20,596.00$115.00$23,000.00
2130.501WATERM GALLONS150$28.50$4,275.00$38.00$5,700.00$32.32$4,848.00$35.00$5,250.00
2131.502CALCIUM CHLORIDE SOLUTIONGALLON600$3.30$1,980.00$2.40$1,440.00$1.08$648.00$4.00$2,400.00
2232.501MILL BITUMINOUS SURFACE (2.0")SQ YD230$8.85$2,035.50$8.80$2,024.00$10.91$2,509.30$15.00$3,450.00
2357.502BITUMINOUS MATERIAL FOR TACK COATGALLON349$3.30$1,151.70$3.19$1,113.31$1.80$628.20$3.30$1,151.70
2360.501TYPE SP 12.5 WEARING COURSE MIX (3,C)TON694$80.00$55,520.00$75.47$52,376.18$73.03$50,682.82$77.50$53,785.00
2360.502TYPE SP 12.5 NON WEAR COURSE MIX (3,C)TON775$80.00$62,000.00$74.50$57,737.50$64.34$49,863.50$76.95$59,636.25
2360.503TYPE SP 12.5 WEAR COURSE MIX (3,C) 4"SQ YD589$20.80$12,251.20$19.93$11,738.77$19.34$11,391.26$20.50$12,074.50
2411.507CONCRETE STAIRWAYEACH1$8,310.00$8,310.00$7,971.00$7,971.00$7,208.53$7,208.53$9,350.00$9,350.00
2411.601DRAINAGE SYSTEMLUMP SUM1$1,982.00$1,982.00$4,750.00$4,750.00$107.75$107.75$8,500.00$8,500.00
2411.618MODULAR BLOCK RETAINING WALLSQ FT469$21.00$9,849.00$28.62$13,422.78$18.54$8,695.26$38.00$17,822.00
2451.607ROCK BEDDING (CV)CU YD115$44.00$5,060.00$27.20$3,128.00$36.04$4,144.60$42.00$4,830.00
2501.51124" CS PIPE CULVERTLIN FT16$48.00$768.00$36.00$576.00$41.19$659.04$36.00$576.00
2501.51524" RC PIPE APRONEACH1$959.00$959.00$347.00$347.00$617.87$617.87$750.00$750.00
2501.51524" GS PIPE APRONEACH1$749.00$749.00$332.00$332.00$360.43$360.43$255.00$255.00
2501.51536" GS PIPE APRONEACH1$1,070.00$1,070.00$515.00$515.00$772.34$772.34$585.00$585.00
2501.51518" RC PIPE APRONEACH1$916.00$916.00$335.00$335.00$514.89$514.89$650.00$650.00
2501.51548" RC PIPE APRONEACH1$1,748.00$1,748.00$763.00$763.00$1,390.22$1,390.22$2,000.00$2,000.00
2501.51515" RC PIPE APRONEACH17$783.00$13,311.00$335.00$5,695.00$463.41$7,877.97$560.00$9,520.00
2501.51536" RC PIPE APRONEACH2$1,549.00$3,098.00$615.00$1,230.00$1,029.79$2,059.58$1,500.00$3,000.00
2501.602TRASH GUARD FOR 48" PIPE APRONEACH1$1,232.00$1,232.00$1,298.00$1,298.00$1,235.75$1,235.75$3,370.00$3,370.00
2501.602TRASH GUARD FOR 36" PIPE APRONEACH3$807.00$2,421.00$826.00$2,478.00$1,235.75$3,707.25$2,000.00$6,000.00
2502.5218" PVC PIPE DRAINLIN FT390$11.50$4,485.00$10.30$4,017.00$14.42$5,623.80$22.00$8,580.00
2502.5214" PVC PIPE DRAINLIN FT94$13.00$1,222.00$13.10$1,231.40$10.30$968.20$24.00$2,256.00
2502.5418" PERF PVC PIPE DRAINLIN FT2,279$18.00$41,022.00$7.55$17,206.45$15.96$36,372.84$6.50$14,813.50
2503.5116" PVC PIPE SEWERLIN FT31$38.00$1,178.00$51.50$1,596.50$12.36$383.16$35.00$1,085.00
2503.51136" CS PIPE SEWERLIN FT5$64.00$320.00$98.00$490.00$102.98$514.90$125.00$625.00
2503.54136" RC PIPE SEWER DES 3006 CL IIILIN FT15$73.00$1,095.00$65.00$975.00$66.94$1,004.10$100.00$1,500.00
2503.54115" RC PIPE SEWER DES 3006LIN FT3,946$37.50$147,975.00$17.85$70,436.10$20.60$81,287.60$29.50$116,407.00
2503.54148" RC PIPE SEWER DES 3006 CL IIILIN FT24$108.00$2,592.00$116.50$2,796.00$97.83$2,347.92$200.00$4,800.00
2503.54118" RC PIPE SEWER DES 3006 CL IIILIN FT20$39.00$780.00$50.00$1,000.00$30.89$617.80$45.00$900.00
2503.54124" RC PIPE SEWER DES 3006 CL IIILIN FT34$42.50$1,445.00$40.60$1,380.40$36.04$1,225.36$45.00$1,530.00
2503.54112" RC PIPE SEWER DES 3006LIN FT250$36.00$9,000.00$17.80$4,450.00$20.08$5,020.00$28.00$7,000.00
2504.6021" CORPORATION STOPEACH1$638.00$638.00$270.00$270.00$360.43$360.43$350.00$350.00
2504.602ADJUST GATE VALVEEACH4$218.00$872.00$275.00$1,100.00$150.72$602.88$250.00$1,000.00
2504.6026" GATE VALVE AND BOXEACH7$1,750.00$12,250.00$856.00$5,992.00$1,802.13$12,614.91$1,250.00$8,750.00
2504.602HYDRANTEACH4$4,173.00$16,692.00$3,111.00$12,444.00$3,604.26$14,417.04$4,900.00$19,600.00
2504.602RELOCATE HYDRANTEACH3$1,740.00$5,220.00$1,950.00$5,850.00$2,574.47$7,723.41$2,800.00$8,400.00
2504.6026"X6" WET TAPEACH1$4,173.00$4,173.00$3,775.00$3,775.00$2,574.47$2,574.47$3,500.00$3,500.00
2504.6020.75" CORPORATION STOPEACH1$600.00$600.00$270.00$270.00$308.94$308.94$350.00$350.00
2504.602RELOCATE CURB STOP & BOXEACH3$1,824.00$5,472.00$1,885.00$5,655.00$772.34$2,317.02$1,600.00$4,800.00
2504.6031" TYPE K COPPER PIPELIN FT5$61.00$305.00$250.00$1,250.00$102.98$514.90$100.00$500.00
2504.6033/4" TYPE K COPPER PIPELIN FT5$59.00$295.00$250.00$1,250.00$102.98$514.90$100.00$500.00
2504.603INSPECTION HOLELIN FT20$141.00$2,820.00$76.00$1,520.00$87.53$1,750.60$75.00$1,500.00
2504.6036" WATERMAIN DUCTILE IRON CL 52LIN FT152$50.00$7,600.00$21.00$3,192.00$46.34$7,043.68$62.00$9,424.00
2504.608WATERMAIN FITTINGSPOUND585$3.50$2,047.50$3.20$1,872.00$4.63$2,708.55$9.00$5,265.00
2506.501CONST DRAINAGE STRUCTURE DES 72-4020LIN FT11.7$350.00$4,095.00$251.00$2,936.70$540.64$6,325.49$550.00$6,435.00
2506.501CONST DRAINAGE STRUCTURE DESIGN HLIN FT86.6$188.00$16,280.80$160.00$13,856.00$257.45$22,295.17$210.00$18,186.00
2506.501CONST DRAINAGE STRUCTURE DESIGN GLIN FT144.2$291.00$41,962.20$202.00$29,128.40$283.19$40,836.00$205.00$29,561.00
2506.501CONST DRAINAGE STRUCTURE DES 60-4020LIN FT25.1$301.50$7,567.65$210.00$5,271.00$463.41$11,631.59$300.00$7,530.00
2506.501CONST DRAINAGE STRUCTURE DESIGN FLIN FT99.2$225.00$22,320.00$150.00$14,880.00$283.19$28,092.45$265.00$26,288.00
2506.501CONST DRAINAGE STRUCTURE DES 48-4020LIN FT19.5$348.00$6,786.00$217.00$4,231.50$308.94$6,024.33$265.00$5,167.50
2506.516CASTING ASSEMBLYEACH79$428.00$33,812.00$601.00$47,479.00$463.41$36,609.39$510.00$40,290.00
2506.522ADJUST FRAME & RING CASTINGEACH10$61.00$610.00$210.00$2,100.00$246.09$2,460.90$325.00$3,250.00
2511.501RANDOM RIPRAP CLASS IIICU YD146.3$81.00$11,850.30$61.00$8,924.30$87.53$12,805.64$85.00$12,435.50
2511.515GEOTEXTILE FILTER TYPE IVSQ YD279$1.00$279.00$0.85$237.15$2.57$717.03$2.50$697.50
2521.5016" CONCRETE WALKSQ FT18,617$4.27$79,494.59$4.97$92,526.49$5.21$96,994.57$6.14$114,308.38
2521.5014" CONCRETE WALKSQ FT1,483$3.21$4,760.43$4.06$6,020.98$4.55$6,747.65$5.48$8,126.84
2521.5114" BITUMINOUS WALKSQ FT80,312$2.50$200,780.00$2.58$207,204.96$2.26$181,505.12$2.45$196,764.40
2521.603SEAL CONCRETE WALK JOINT (SILICONE)LIN FT60$5.55$333.00$5.31$318.60$5.15$309.00$4.00$240.00
2531.501CONCRETE CURB & GUTTER DESIGN D412LIN FT201$16.00$3,216.00$17.53$3,523.53$14.66$2,946.66$18.55$3,728.55
2531.501CONCRETE CURB & GUTTER DESIGN B612LIN FT263$16.00$4,208.00$17.65$4,641.95$14.66$3,855.58$18.55$4,878.65
2531.501CONCRETE CURB & GUTTER DESIGN B618LIN FT337$17.00$5,729.00$18.66$6,288.42$15.95$5,375.15$19.55$6,588.35
2531.501CONCRETE CURB & GUTTER DESIGN B424LIN FT5,119$13.80$70,642.20$16.51$84,514.69$17.75$90,862.25$16.55$84,719.45
2531.501CONCRETE CURB & GUTTER DESIGN B624LIN FT84$21.50$1,806.00$22.92$1,925.28$20.84$1,750.56$28.55$2,398.20
2531.502CONCRETE CURB DESIGN SPECIALLIN FT18$22.00$396.00$26.66$479.88$28.57$514.26$31.50$567.00
2531.503CONCRETE MEDIANSQ YD54$53.00$2,862.00$51.18$2,763.72$54.81$2,959.74$57.45$3,102.30
2531.5078" CONCRETE DRIVEWAY PAVEMENTSQ YD431.8$53.00$22,885.40$60.03$25,920.95$51.56$22,263.61$63.45$27,397.71
2531.603CONCRETE VALLEY GUTTERLIN FT91$18.50$1,683.50$19.72$1,794.52$17.34$1,577.94$24.45$2,224.95
2533.507PORTABLE PRECAST CONC BARRIER DES 8337LIN FT4,254$13.00$55,302.00$13.82$58,790.28$13.39$56,961.06$16.50$70,191.00
2533.508RELOCATE PORT PRECAST CONC BAR DES 8337LIN FT1,000$4.15$4,150.00$3.99$3,990.00$3.86$3,860.00$4.50$4,500.00
2540.602MAIL BOX SUPPORTEACH8$165.00$1,320.00$175.38$1,403.04$53.87$430.96$150.00$1,200.00
2540.603INSTALL LANDSCAPE EDGINGLIN FT41$5.00$205.00$6.00$246.00$3.23$132.43$15.00$615.00
2540.603LANDSCAPE EDGERLIN FT21$7.75$162.75$11.00$231.00$10.77$226.17$15.00$315.00
2540.603METAL RAILINGLIN FT18$95.00$1,710.00$106.29$1,913.22$179.94$3,238.92$125.00$2,250.00
2540.618CONCRETE PAVERSSQ FT4,103$7.50$30,772.50$7.34$30,116.02$8.88$36,434.64$8.10$33,234.30
2545.602ADJUST HANDHOLEEACH2$165.00$330.00$560.00$1,120.00$161.62$323.24$500.00$1,000.00
2554.602IMPACT ATTENUATOR BARRELSEACH10$220.00$2,200.00$255.10$2,551.00$247.15$2,471.50$210.00$2,100.00
2554.615RELOCATE IMPACT ATTENUATORASSEMBLY4$710.00$2,840.00$680.26$2,721.04$659.07$2,636.28$700.00$2,800.00
2554.615IMPACT ATTENUATORASSEMBLY8$3,545.00$28,360.00$3,826.43$30,611.44$3,707.24$29,657.92$3,450.00$27,600.00
2563.601TRAFFIC CONTROLLUMP SUM1$14,960.00$14,960.00$42,037.58$42,037.58$15,728.83$15,728.83$28,500.00$28,500.00
2563.601DETOUR SIGNINGLUMP SUM1$2,435.00$2,435.00$7,971.73$7,971.73$7,723.42$7,723.42$2,400.00$2,400.00
2563.613REFLECTORIZED DRUM W/DOWN ARROWUNIT DAY100$0.95$95.00$0.80$80.00$0.77$77.00$1.25$125.00
2563.613TYPE III BARRICADESUNIT DAY50$3.05$152.50$2.13$106.50$2.06$103.00$3.00$150.00
2563.613PORTABLE CHANGEABLE MESSAGE SIGNUNIT DAY20$220.00$4,400.00$212.58$4,251.60$205.96$4,119.20$220.00$4,400.00
2563.613FLASHER TYPE A (LOW INTENSITY)UNIT DAY50$0.60$30.00$0.53$26.50$0.51$25.50$1.00$50.00
2563.618CONSTRUCTION SIGN-SPECIALSQ FT100$21.60$2,160.00$21.26$2,126.00$20.60$2,060.00$21.00$2,100.00
2564.531SIGN PANELS TYPE CSQ FT290.4$31.50$9,147.60$34.54$10,030.42$33.47$9,719.69$31.00$9,002.40
2564.537INSTALL SIGN TYPE CEACH7$105.00$735.00$106.29$744.03$102.98$720.86$110.00$770.00
2564.537INSTALL SIGN TYPE SPECIALEACH7$1,800.00$12,600.00$132.86$930.02$128.72$901.04$135.00$945.00
2564.602INSTALL SIGN COLLAREACH16$11.08$177.28$10.63$170.08$102.98$1,647.68$65.00$1,040.00
2572.501TEMPORARY FENCELIN FT2,038$1.95$3,974.10$2.91$5,930.58$1.75$3,566.50$1.50$3,057.00
2573.501BALE BARRIERLIN FT356$4.00$1,424.00$3.79$1,349.24$3.68$1,310.08$3.15$1,121.40
2573.502SILT FENCE, TYPE HEAVY DUTYLIN FT2,303$1.70$3,915.10$1.98$4,559.94$1.58$3,638.74$1.75$4,030.25
2573.502SILT FENCE, TYPE MACHINE SLICEDLIN FT2,045$1.70$3,476.50$2.02$4,130.90$1.58$3,231.10$1.55$3,169.75
2573.512TEMPORARY DITCH CHECK TYPE 2LIN FT276$4.50$1,242.00$4.34$1,197.84$4.20$1,159.20$3.25$897.00
2573.513TEMPORARY DITCH CHECK TYPE 5CU YD120$51.00$6,120.00$41.11$4,933.20$87.53$10,503.60$110.00$13,200.00
2573.513TEMPORARY DITCH CHECK TYPE 7CU YD84$51.00$4,284.00$65.60$5,510.40$87.53$7,352.52$125.00$10,500.00
2573.520SEDIMENT REMOVAL BACKHOEHOUR40$162.00$6,480.00$163.59$6,543.60$102.98$4,119.20$135.00$5,400.00
2573.530STORM DRAIN INLET PROTECTIONEACH76$175.00$13,300.00$158.96$12,080.96$205.96$15,652.96$275.00$20,900.00
2573.540FILTER LOG TYPE COMPOST LOGLIN FT1,737$4.50$7,816.50$4.34$7,538.58$4.20$7,295.40$2.25$3,908.25
2573.550EROSION CONTROL SUPERVISORLUMP SUM1$3,650.00$3,650.00$1,553.20$1,553.20$12,929.72$12,929.72$4,500.00$4,500.00
2575.501SEEDINGACRE5.5$115.00$632.50$108.42$596.31$105.04$577.72$500.00$2,750.00
2575.502SEED MIXTURE 350POUND408$4.35$1,774.80$4.18$1,705.44$4.05$1,652.40$5.00$2,040.00
2575.502SEED MIXTURE 328POUND47$5.65$265.55$5.42$254.74$5.25$246.75$10.00$470.00
2575.505SODDING TYPE LAWNSQ YD3,192$2.85$9,097.20$2.71$8,650.32$2.63$8,394.96$4.75$15,162.00
2575.511MULCH MATERIAL TYPE 3TON8.4$115.00$966.00$108.42$910.73$105.04$882.34$250.00$2,100.00
2575.513MULCH MATERIAL TYPE 6CU YD4$25.00$100.00$37.20$148.80$41.19$164.76$125.00$500.00
2575.519DISK ANCHORINGACRE4.2$115.00$483.00$108.42$455.36$105.04$441.17$100.00$420.00
2575.523EROSION CONTROL BLANKETS CATEGORY 3SQ YD5,672$1.00$5,672.00$0.98$5,558.56$0.95$5,388.40$1.10$6,239.20
2575.532FERTILIZER TYPE 4POUND803$0.55$441.65$0.54$433.62$0.53$425.59$1.00$803.00
2575.560HYDRAULIC SOIL STABILIZER TYPE 5POUND6,000$0.80$4,800.00$0.75$4,500.00$0.73$4,380.00$1.00$6,000.00
2575.570RAPID STABILIZATION METHOD 1ACRE1.3$900.00$1,170.00$1,334.35$1,734.66$840.32$1,092.42$1,500.00$1,950.00
2575.572RAPID STABILIZATION METHOD 4SQ YD12,454$1.10$13,699.40$1.08$13,450.32$1.05$13,076.70$1.35$16,812.90
2575.604GEOTEXTILE WEED BARRIER FABRICSQ YD57$1.00$57.00$5.31$302.67$3.09$176.13$5.00$285.00
2575.607LANDSCAPE ROCKCU YD2$52.00$104.00$106.29$212.58$36.05$72.10$250.00$500.00
2581.501REMOVABLE PREFORMED PLASTIC MARKINGLIN FT2,238$1.30$2,909.40$1.12$2,506.56$1.08$2,417.04$1.50$3,357.00
2582.501PAVT MSSG (RR XING) EPOXYEACH1$830.00$830.00$797.17$797.17$772.34$772.34$1,300.00$1,300.00
2582.501PAVT MSSG (RT ARROW) EPOXYEACH5$171.00$855.00$164.75$823.75$159.62$798.10$185.00$925.00
2582.50224" STOP LINE WHITE-PAINTLIN FT28$1.10$30.80$4.25$119.00$4.12$115.36$11.00$308.00
2582.5024" BROKEN LINE YELLOW-EPOXYLIN FT2,446$2.05$5,014.30$1.97$4,818.62$1.91$4,671.86$1.10$2,690.60
2582.50224" STOP LINE WHITE-EPOXYLIN FT68$8.85$601.80$8.50$578.00$8.24$560.32$18.00$1,224.00
2582.5024" DOUBLE SOLID LINE YELLOW-PAINTLIN FT356$0.83$295.48$0.80$284.80$0.77$274.12$0.75$267.00
2582.50224" SOLID LINE YELLOW-EPOXYLIN FT61$8.85$539.85$8.50$518.50$8.24$502.64$17.25$1,052.25
2582.50212" SOLID LINE WHITE-EPOXYLIN FT24$8.30$199.20$7.97$191.28$7.72$185.28$14.50$348.00
2582.5024" SOLID LINE WHITE-EPOXYLIN FT302$1.60$483.20$1.54$465.08$1.49$449.98$1.10$332.20
2582.5024" DOUBLE SOLID LINE YELLOW-EPOXYLIN FT444$3.20$1,420.80$3.08$1,367.52$2.99$1,327.56$2.10$932.40
2582.5024" SOLID LINE YELLOW-EPOXYLIN FT246$1.60$393.60$1.54$378.84$1.49$366.54$1.10$270.60
2582.5024" SOLID LINE WHITE-PAINTLIN FT6,585$1.10$7,243.50$0.27$1,777.95$0.26$1,712.10$0.35$2,304.75
2582.503CROSSWALK MARKING-EPOXYSQ FT1,260$5.30$6,678.00$5.10$6,426.00$4.94$6,224.40$9.50$11,970.00
 Totals for project 2013002 $1,721,590.03 $1,743,317.69 $1,921,127.00 $2,247,772.63
 
Contract Total:$1,721,590.03$1,743,317.69$1,921,127.00$2,247,772.63